Procurement Summary
Country: Andorra
Summary: N08.60 ep interlaken ost - brienz, lot e41 signalisation - supply, installation, commissioning of traffic control systems - delivery, installation, commissioning of signaling equipment - delivery, ins...
Deadline: 19 Nov 2018
Posting Date: 28 Sep 2018
Other Information
Notice Type: Tender
TOT Ref.No.: 27174588
Document Ref. No.: 1040329
Competition: ICB
Financier: Self Financed
Purchaser Ownership: -
Tender Value: Refer Document
CPV Classification
31720000 - Electromechanical equipment
Purchaser's Detail
Name: Login to see tender_details
Address: Login to see tender_details
Email: Login to see tender_details
Login to see detailsTender Details
N08.60 ep interlaken ost - brienz, lot e41 signalisation - supply, installation, commissioning of traffic control systems - delivery, installation, commissioning of signaling equipment - delivery, installation, commissioning of traffic counters
since its inauguration, the national road n08 between interlaken ost and brienz has not been extensively renovated. As part of the current conservation project, all operating and safety equipment will be replaced. The present lot includes the manufacture, delivery, installation, commissioning and testing of the signaling system for the tunnels sengg, chueebalm and giessbach as well as for the open track (including the facilities of the brienzerseeweiche (brw) and the avalanche warning system lwa). It comprises the following: - central facilities (as and ls), - control box (qsk), - dynamic led and prism signals, - static signaling, - traffic detection / counter, - safety equipment and - temporaries. During the reconstruction phasen the equipment, the safety level must not fall below the current level. All work in the driving area must be carried out at night. By day the tunnels are passable for traffic without restriction.
2.7 place of execution
site-based services are provided on site, respectively at the location of the location and astra infrastructure branch in thun, offices in visp or headquarters in ittigen (sessions)
2.8 duration of contract, framework agreement or dynamic purchasing system
start: 07.05.2019, end: 31.12.2024
this order can be extended: yes
explanation of extensions: an extension will apply if the required credit release, the frirequired for approval procedures and / or unforeseen circumstances.
2.9 options
no
2.10 award criteria
see point 4.5 other information of the simap publication
2.11 are variants allowed
no
remarks: lump sum and global offers and / or offers with zeitmitteltarif are excluded.
2.12 subcontracts zugelassen
no
comments: tenders must be submitted in their entirety. Changes to the offer text are not permitted. Partial offers are invalid and are excluded from the application.
2.13 execution date
beginning 07.05.2019 and end 31.12.2024
remarks: the dates can vary depending on the course of the project / credit approval ofdiffer from the information and do not entitle to additional claims.
Third
Documents
Tender Notice