Procurement Summary
Country: Canada
Summary: Municipality of Louise - Bridge Replacements (2022 Site #20 & 2023 Site #5)
Deadline: 23 Apr 2026
Posting Date: 11 Apr 2026
Other Information
Notice Type: Tender
TOT Ref.No.: 139374450
Document Ref. No.: 113733930/113733931
Competition: ICB
Financier: Self Financed
Purchaser Ownership: Public
Tender Value: Refer Document
Purchaser's Detail
Name: Login to see tender_details
Address: Login to see tender_details
Email: Login to see tender_detailsLogin to see details
Tender Details
MEMO Site #20 (2022 Spring Flood) - Bridge Replacement over Pilot Creek on Road 64W: The Work generally includes the removal of the existing single-barrel corrugated steel pipe culvert, and the construction of a new prestressed precast concrete box girder bridge founded on steel abutments with steel piles. The superstructure is a single-span bridge measuring 24 m long x 7.2 m wide out-to-out. Slope stabilization in the form of rockfill columns and effective shear keys. The structure crosses over the Pilot Creek on Road 64W between Road 15N and PR253 in the Municipality of Louise, Manitoba. Approximate GPS coordinates are UTM Zone 14U 506784 m E, 5450659 m NMEMO Site #5 (2023 Spring Flood) - Bridge Replacement over Crystal Creek on Road 67W: The Work generally includes the removal of the remnants of the previous crossing and the construction of a new prestressed precast concrete box girder bridge founded on steel abutments with steel piles. The superstructure is a single-span bridge measuring 27 m long x 7.2 m wide out-to-out. Mechanically stabilized earth walls are to be constructed behind the abutments. The structure crosses over the Crystal Creek on Road 67W between Roads 11N and 12N in the Municipality of Louise, Manitoba. Approximate GPS coordinates are UTM Zone 14U 502383 m E, 5446091 m N.
Reference Number : 0000319485 Location : Canada, Manitoba, South Central Job Location : Municipality of Louise Description : MEMO Site #20 (2022 Spring Flood) - Bridge Replacement over Pilot Creek on Road 64W: The Work generally includes the removal of the existing single-barrel corrugated steel pipe culvert, and the construction of a new prestressed precast concrete box girder bridge founded on steel abutments with steel piles. The superstructure is a single-span bridge measuring 24 m long x 7.2 m wide out-to-out. Slope stabilization in the form of rockfill columns and effective shear keys. The structure crosses over the Pilot Creek on Road 64W between Road 15N and PR253 in the Municipality of Louise, Manitoba. Approximate GPS coordinates are UTM Zone 14U 506784 m E, 5450659 m NMEMO Site #5 (2023 Spring Flood) - Bridge Replacement over Crystal Creek on Road 67W: The Work generally includes the removal of the remnants of the previous crossing and the construction of a new prestressed precast concrete box girder bridge founded on steel abutments with steel piles. The superstructure is a single-span bridge measuring 27 m long x 7.2 m wide out-to-out. Mechanically stabilized earth walls are to be constructed behind the abutments. The structure crosses over the Crystal Creek on Road 67W between Roads 11N and 12N in the Municipality of Louise, Manitoba. Approximate GPS coordinates are UTM Zone 14U 502383 m E, 5446091 m N.
Documents
Tender Notice