Muddy River Flood Damage Reduction - Phase 2 Tender in USA - 32163891

The DEPARTMENT OF THE ARMY has issued a Tender notice for the procurement of a Muddy River Flood Damage Reduction - Phase 2, Boston And Brookline, Massachusetts in the USA. This Tender notice was published on 10 Apr 2019 and is scheduled to close on 09 May 2019, with an estimated Tender value of Refer Document. Interested bidders can access detailed Tender information, eligibility criteria, and complete bidding documents by referencing TOT Ref No. 32163891, while the tender notice number is W912WJ19R0014 and Registering on the platform.

Expired Tender

Procurement Summary

Country: USA

Summary: Muddy River Flood Damage Reduction - Phase 2, Boston And Brookline, Massachusetts

Deadline: 09 May 2019

Posting Date: 10 Apr 2019

Other Information

Notice Type: Tender

TOT Ref.No.: 32163891

Document Ref. No.: W912WJ19R0014

Competition: ICB

Financier: Self Financed

Purchaser Ownership: -

Tender Value: Refer Document

CPV Classification

45210000 - Building construction work

Purchaser's Detail

Name: Login to see tender_details

Address: Login to see tender_details

Email: Login to see tender_detailsLogin to see details

Tender Details

Muddy river flood damage reduction - phase 2, boston and brookline, massachusetts
Response Date : 2019-05-09
[Disclaimer : For this notice no specific deadline was given hence we have added 30 days from the date of posting to transfer the notice to archieve database. You are requested to consult the individual purchaser for exact deadline.]
The u.s. Army corps of engineers, new england district is issuing the presolicitation notice for a construction project of the muddy river flood damage reduction project - phase 2, boston and brookline, massachusetts.
The estimated construction cost is between $25, 000, 000 and $100, 000, 000.
The project scope of work consists of dredging 1 to 8 feet of sediment from the bottom of the river to construct the flood risk management channel, stabilizing the material for transport, and trucking the material for disposal in landfills. The project is set within and part of the historic frederick law olmsted's "emerald necklace" park system and is listed in national register of historic places. The contractor shall not impact areas outside the limits of work.
The work of this project consist of the following:
excavate the river in the back bay fens area of the muddy river. Excavate five stretches of the riverway section of the muddy river. Excavate the sandbar and island at leverett pond. Excavations may be performed mechanically in wet conditions or by the establishment of water diversion structures with excavation performed in dry conditions. Handling, characterization and disposal of excavated material is required. As part of the work, provide additional flood protection at the boston fire department fire control center in the back bay fens.
Eradicate phragmites in the back bay fens and riverway areas where indicated to achieve flood damage reduction. Restore wetland vegetation in excavated areas by planting appropriate emergent wetland plants. Restore riparian vegetation in upland areas where phragmites are eradicated by planting trees and shrubs. Restore vegetation and other landscape features disturbed at staging areas and within the limit of work. Installation of boulders and habitat logs for fish, turtles and amphibians.
Significant incidental work necessary to accomplish the work described above includes: control of river flow; control of...

Documents

 Tender Notice


Similar Tenders

Request Demo
GiZ Tenders India

Procurement Documents for USA

Access a comprehensive library of standard procurement documents specific to USA. Here, you'll find all the essential forms, guidelines, and templates required for tender applications and submissions in USA

Explore Procurement Documents for USA


Want To Bid in This Tender?

Get Local Agent Support in USA and 60 More Countries.

View All The Services


View Tenders By


Publish Tenders


Have Any Dispute With The Purchaser?