Procurement Summary
Country: USA
Summary: Muddy River Flood Damage Reduction - Phase 2, Boston And Brookline, Massachusetts
Deadline: 09 May 2019
Posting Date: 10 Apr 2019
Other Information
Notice Type: Tender
TOT Ref.No.: 32163891
Document Ref. No.: W912WJ19R0014
Competition: ICB
Financier: Self Financed
Purchaser Ownership: -
Tender Value: Refer Document
CPV Classification
45210000 - Building construction work
Purchaser's Detail
Name: Login to see tender_details
Address: Login to see tender_details
Email: Login to see tender_detailsLogin to see details
Tender Details
Muddy river flood damage reduction - phase 2, boston and brookline, massachusetts
Response Date : 2019-05-09
[Disclaimer : For this notice no specific deadline was given hence we have added 30 days from the date of posting to transfer the notice to archieve database. You are requested to consult the individual purchaser for exact deadline.]
The u.s. Army corps of engineers, new england district is issuing the presolicitation notice for a construction project of the muddy river flood damage reduction project - phase 2, boston and brookline, massachusetts.
The estimated construction cost is between $25, 000, 000 and $100, 000, 000.
The project scope of work consists of dredging 1 to 8 feet of sediment from the bottom of the river to construct the flood risk management channel, stabilizing the material for transport, and trucking the material for disposal in landfills. The project is set within and part of the historic frederick law olmsted's "emerald necklace" park system and is listed in national register of historic places. The contractor shall not impact areas outside the limits of work.
The work of this project consist of the following:
excavate the river in the back bay fens area of the muddy river. Excavate five stretches of the riverway section of the muddy river. Excavate the sandbar and island at leverett pond. Excavations may be performed mechanically in wet conditions or by the establishment of water diversion structures with excavation performed in dry conditions. Handling, characterization and disposal of excavated material is required. As part of the work, provide additional flood protection at the boston fire department fire control center in the back bay fens.
Eradicate phragmites in the back bay fens and riverway areas where indicated to achieve flood damage reduction. Restore wetland vegetation in excavated areas by planting appropriate emergent wetland plants. Restore riparian vegetation in upland areas where phragmites are eradicated by planting trees and shrubs. Restore vegetation and other landscape features disturbed at staging areas and within the limit of work. Installation of boulders and habitat logs for fish, turtles and amphibians.
Significant incidental work necessary to accomplish the work described above includes: control of river flow; control of...