Procurement Summary
Country: USA
Summary: MQC & MBE System Installation Construction Project
Deadline: 31 Jul 2025
Other Information
Notice Type: Tender
TOT Ref.No.: 123400765
Document Ref. No.: SLAC_357827
Financier: Self Financed
Purchaser Ownership: Public
Tender Value: Refer Document
Purchaser's Detail
Name: Login to see tender_details
Address: Login to see tender_details
Email: Login to see tender_details
Login to see detailsTender Details
Description
The subject RFP is a Sources Sought Notice only to identify General Contractors (GC) who are capable of completing the planned construction of the Materials Characterization and Quantum (MQC) performance Molecular Beam Epitaxy (MBE) installation project, to support the MBE tool and its utility infrastructure installation. This is not a solicitation for proposal or quotations and no award will be made from this Notice. SLAC intends to issue a formal solicitation later based on responses from this Source Sought Notice.
The site for these services is at the SLAC National Accelerator Laboratory, 2575 Sand Hill Rd, Menlo Park, CA 94025. The MQC and MBE installation projects are directly funded by the DOE's Office of Science.
The attached construction RFP documents consist of administrative and technical specifications and drawings approved by SLAC-s Building Inspection Office (BIO) and will be used as the basis for formal construction design and technical proposals.
PLANNED SCOPE AND DESCRIPTION OF SERVICES
The basis of the construction effort is to complete the work indicated in this SOW to deliver fully functional power, Process cooling water (PCW) system, Closed Loop CHWS/CHWR system, Liquid Nitrogen (LN2) Distribution, Process Gas System, Cryo-Compressor and LN2 Pumping Equipment, Electrical feeders for the MBE tool and mechanical systems, and Structural anchoring for the MBE tool and infrastructure systems.
SLAC National Accelerator Laboratory is seeking to award a design-bid-build (DBB) construction subcontract to an experienced and highly qualified and skilled GC, to perform the requirements identified on the Statement of Work. The GC is required to complete the MQC and MBE installation projects as detailed within the SOW; it-s supporting attachments and drawings. The GC is required to adhere to the project schedule, as outlined within the Statement of Work (SOW), while working in conjunction with SLAC to deliver the utmost sa...
Active Contract Opportunity
Notice ID : SLAC_357827
Related Notice
Department/Ind. Agency : ENERGY, DEPARTMENT OF
Sub-tier : ENERGY, DEPARTMENT OF
Office: SLAC Natl Accel Lab -DOE Contractor
General Information
Contract Opportunity Type: Sources Sought (Original)
Original Published Date: Jul 25, 2025 12:27 pm PDT
Original Response Date: Jul 31, 2025 03:00 pm PDT
Inactive Policy: 15 days after response date
Original Inactive Date: Aug 15, 2025
Initiative: None
Classification
Original Set Aside: No Set aside used
Product Service Code:
NAICS Code: 236220 - Commercial and Institutional Building Construction
Place of Performance: Menlo Park, CA 94025 USA
Documents
Tender Notice
B2.pdf
B2.pdf
B2.pdf
B2.pdf
B2.pdf
B2.pdf
B2.pdf
B2.pdf
B2.pdf
B2.pdf
B2.pdf
B2.pdf
B2.pdf
B2.pdf
B2.pdf
B2.pdf
B2.pdf
B2.pdf
B2.pdf
B2.pdf
B2.pdf
B2.pdf
B2.pdf
B2.pdf
B2.pdf
B2.pdf
B2.pdf