Procurement Summary
Country: USA
Summary: Mosquito Creek Lake Control Tower Roof Replacement
Deadline: 12 Aug 2026
Posting Date: 07 Aug 2026
Other Information
Notice Type: Tender
TOT Ref.No.: 146712718
Document Ref. No.: W911WN26Q1CBD
Competition: ICB
Financier: Self Financed
Purchaser Ownership: Public
Tender Value: Refer Document
Purchaser's Detail
Name: Login to see tender_details
Address: Login to see tender_details
Email: Login to see tender_details
Login to see detailsTender Details
SOURCES SOUGHT NOTICE
Mosquito Creek Lake Structural Standing Seam Metal Roofing Replacement
Agency: U.S. Army Corps of Engineers (USACE), Pittsburgh District
Location: Mosquito Creek Lake, Cortland, OH
NAICS Code: 238160 - Roofing Contractors (Size Standard: $19.0 Million)
Product Service Code (PSC): Y1QA - Construction of Restoration of Real Property (Public or Private).
Response Deadline: 12 August 2026, 5:00 P.M. E.T.
Primary Point of Contact: Mario Taormina at [email protected] and (412) 395-7256.
1. INTRODUCTION & DISCLAIMER
This is a Sources Sought Notice for market research purposes only. This is not a solicitation, Request for Quote. No contract will be awarded from this announcement, and no reimbursement will be made for any costs associated with providing a response.
The U.S. Army Corps of Engineers is seeking to identify qualified small businesses (including 8(a), HUBZone, Service-Disabled Veteran-Owned Small Businesses [SDVOSB], and Women-Owned Small Businesses [WOSB]) capable of performing the control tower roof replacement project described below. The results of this market research will be used to determine the appropriate acquisition strategy, including whether a small business set-aside is warranted.
2. PROJECT DESCRIPTION & SYNOPSIS
This project consists of furnishing all necessary labor, materials, tools, supplies, and equipment for the complete replacement of the structural standing seam metal roofing system on the Control Tower Building (also known as the Operating House Building) located at Mosquito Creek Lake in Cortland, OH.
The contractor will be required to complete all work within 365 calendar days after written Notice to Proceed (NTP).
Major Technical Components of the Work:
Demolition and Disposal: Complete removal and legal, off-site disposal of the existing standing seam metal roof panel system, box gutter, scuppers, and lightning protection system down to the original concrete...
Notice ID: w911wn26q1cbd
Department/Ind. Agency: dept of defense
Sub-tier: dept of the army
Office: w072 endist pittsburgh
Product Service Code: y1qa - construction of restoration of real property (public or private)
NAICS Code: 238160 - Roofing Contractors
Inactive Dates: aug 27, 2026
Inactive Policy: 15 days after response date
Documents
Tender Notice