Procurement Summary
Country: Poland
Summary: Modernization of Small Retention Reservoirs in the Historic Park in Daszyn
Deadline: 11 Aug 2026
Posting Date: 25 Jul 2026
Other Information
Notice Type: Tender
TOT Ref.No.: 145899569
Document Ref. No.: 2026/BZP 00360600/01
Competition: ICB
Financier: Self Financed
Purchaser Ownership: Public
Tender Value: Refer Document
CPV Classification
45000000 - Construction work
71320000 - Engineering design services
45110000 - Building demolition and wrecking work and earthmoving work
45112000 - Excavating and earthmoving work
45246000 - River regulation and flood control works
45247000 - Construction work for dams, canals, irrigation channels and aqueducts
45233161 - Footpath construction work
77310000 - Planting and maintenance services of green areas
77314100 - Grassing services
77211500 - Tree-maintenance services
09332000 - Solar installation
45261215 - Solar panel roof-covering work
45311100 - Electrical wiring work
45312310 - Lightning-protection works
31156000 - Interruptible power supplies
Purchaser's Detail
Name: Login to see tender_details
Address: Login to see tender_details
Email: Login to see tender_detailsLogin to see details
Tender Details
Modernization of small retention reservoirs in the historic park in Daszyn. Execution in the design and build formula of design documentation and construction works in accordance with the Functional and Utility Program, hereinafter referred to as PFU, constituting Annex No. 9 to SWZ and consisting in preparing design documentation (design, obtaining legally required decisions and construction permits) and carrying out construction works. As part of this order, any studies that may be necessary must be prepared design, construction and use of the subject of the order. All studies should be prepared in a number of copies enabling obtaining all necessary agreements and permits, plus always 2 copies for the Ordering Party. a) Documentation design. The documentation part should: - develop (if required) an assessment of the investment's impact on the environment; - develop situational and altitude maps for design purposes; - develop a natural inventory - develop projects architectural and construction in all necessary industries along with all required arrangements, including with network operators, ...
Documents
Tender Notice