Procurement Summary
Country: Poland
Summary: Modernization of Rooms in the Diagnostics Diagnostics Department
Deadline: 02 Sep 2026
Posting Date: 17 Aug 2026
Other Information
Notice Type: Tender
TOT Ref.No.: 147363949
Document Ref. No.: 2026/BZP 00393454/01
Competition: ICB
Financier: Self Financed
Purchaser Ownership: Public
Tender Value: Refer Document
CPV Classification
45453000 - Overhaul and refurbishment work
71221000 - Architectural services for buildings
71248000 - Supervision of project and documentation
71240000 - Architectural, engineering and planning services
71320000 - Engineering design services
45300000 - Building installation work
45311000 - Electrical wiring and fitting work
45310000 - Electrical installation work
45330000 - Plumbing and sanitary works
45431000 - Tiling work
45312000 - Alarm system and antenna installation work
45100000 - Site preparation work
45260000 - Roof works and other special trade construction works
45262000 - Special trade construction works other than roof works
45432000 - Floor-laying and covering, wall-covering and wall-papering work
45421000 - Joinery work
Purchaser's Detail
Name: Login to see tender_details
Address: Login to see tender_details
Email: Login to see tender_details
Login to see detailsTender Details
1. The subject of the order are construction and installation works consisting in the modernization of rooms in the Imaging Diagnostics Department (Main Building, floor 0, segment C1 and C2) at the Specialist Hospital. Ludwika Rydygiera w Krakowie sp. z o.o..2. Detailed description the subject of the order is included in this Specification, in particular the Functional and Utility Program constituting Annex No. 1 to this Specification, as well as the draft contract constituting Annex No. 3 to the Specification.3. Work elements not included in the offer calculation or not priced and resulting directly from the tender documentation (Functional and Utility Program, Specification) the Ordering Party will consider them priced and included in the offer, without any claims by the Contractor in this respect. Due to the above, it is required from Contractors thorough checking of the documentation and conditions prevailing in the investment area. The consequences of any errors in the offer calculation prepared by the Contractor shall be borne by the Contractor who must anticipate all circumstances that may affect the price of the order. The Contractor is advised to obtain all information that may be necessary to prepare the offer, including...
Documents
Tender Notice