Procurement Summary
Country: Poland
Summary: Modernization of the Ligota Traction Substation Along with the Construction of the Necessary Technical Infrastructure in the Design and Build Formula
Deadline: 25 Aug 2026
Posting Date: 20 Jul 2026
Other Information
Notice Type: Tender
TOT Ref.No.: 145509473
Document Ref. No.: 499580-2026
Competition: ICB
Financier: Self Financed
Purchaser Ownership: Public
Tender Value: Refer Document
CPV Classification
45000000 - Construction work
45100000 - Site preparation work
51100000 - Installation services of electrical and mechanical equipment
51900000 - Installation services of guidance and control systems
65300000 - Electricity distribution and related services
71200000 - Architectural and related services
71000000 - Architectural, construction, engineering and inspection services
71300000 - Engineering services
Purchaser's Detail
Name: Login to see tender_details
Address: Login to see tender_details
Email: Login to see tender_detailsLogin to see details
Tender Details
Modernization of the Ligota Traction Substation along with the construction of the necessary technical infrastructure in the design and build formula The subject of the order is the adaptation of the Ligota traction substation building along with the construction of the necessary technical infrastructure in the formula design and build. The subject of the order is related to the construction of railway line No. 139 Katowice - Zwardoń from km 0.000 to km 7.624 and railway line No. 656 from km 0.000 to km 7.092. The contractor is obliged to complete the subject of the order using this method comprehensive: design and build. The Subject of the Order includes the development of Formal Documentation, Technical Documentation, including the Detailed Design, execution of Works and Works, as well as the supply of a set of materials and carrying out all the planned the requirements of the Ordering Party, the provisions of the Applicable Law and the Distribution System Operator, acceptance and tests conditioning the commissioning and commissioning of the traction substation. When implementing the Works, the Contractor should use the information provided by the Employer documentation and decisions that are detailed in the Information Part of the PFU. The Information Part of the PFU also indicates the works that the Employer plans to perform with its own resources. A detailed description of the subject of the order is included in Annex No. 1 to the SWZ - Program Functional and utilitarian. The subject of the order is the adaptation of the Ligota traction substation building along with the construction of the necessary technical infrastructure in the design and build formula. The subject of the order after...
Document Type: Contract Notice Reference Number: POST/HZ/EO/HZL/00205/2026 Contract Type: works Authority Type: body-pl-cga Doc Title: Modernization of the Ligota Traction Substation along with the construction of the necessary technical infrastructure in the design and development formula buduj Dispatch Date: 2026-07-17 Publish Date: 2026-07-20 Submission Date: 2026-08-25
Documents
Tender Notice