Procurement Summary
Country: Poland
Summary: Modernization of Heating Networks with the Construction of Municipal Heat Sources Based on Renewable Energy Sources in the Daszyna Commune - Part I
Deadline: 25 Aug 2026
Posting Date: 08 Aug 2026
Other Information
Notice Type: Tender
TOT Ref.No.: 146828905
Document Ref. No.: 2026/BZP 00382244/01
Competition: ICB
Financier: Self Financed
Purchaser Ownership: Public
Tender Value: Refer Document
CPV Classification
45000000 - Construction work
71000000 - Architectural, construction, engineering and inspection services
71300000 - Engineering services
71320000 - Engineering design services
71323100 - Electrical power systems design services
42511110 - Heat pumps
09331200 - Solar photovoltaic modules
45331000 - Heating, ventilation and air-conditioning installation work
45330000 - Plumbing and sanitary works
45320000 - Insulation work
45317000 - Other electrical installation work
45310000 - Electrical installation work
45315300 - Electricity supply installations
09332000 - Solar installation
45261215 - Solar panel roof-covering work
45311100 - Electrical wiring work
45312310 - Lightning-protection works
Purchaser's Detail
Name: Login to see tender_details
Address: Login to see tender_details
Email: Login to see tender_detailsLogin to see details
Tender Details
1. Description of the subject of the order: Modernization of heating networks together with the construction of municipal heat sources based on renewable energy sources in the Daszyna commune - Modernization of the heating network together with the construction of a municipal heat source based on renewable energy sources in Daszyna. Execution in the design formula and construction of design documentation and construction works in accordance with the Functional and Utility Program, hereinafter referred to as FFU, constituting Annex No. 9a to SWZ and consisting in the preparation of design documentation (design, obtaining legally required decisions and building permit) and implementation of construction works. As part of this order, any studies that may be necessary for the design, construction and use of the subject of the order must be prepared. All studies should be prepared in quantity copies enabling obtaining all necessary agreements and permits, plus always 2 additional copies for the Ordering Party. a) Design documentation. The documentation part should include: - preparation (if required) of an impact assessment investments per pedigree;- development of situation-elevation maps for design purposes;- development of projects archit...
Documents
Tender Notice