Procurement Summary
Country: Poland
Summary: Modernization and Renovation of Parts of Railway Siding Tracks (208-03-Pzo)
Deadline: 08 Jul 2026
Posting Date: 27 Jun 2026
Other Information
Notice Type: Tender
TOT Ref.No.: 144109816
Document Ref. No.: WNP-044881
Competition: ICB
Financier: Self Financed
Purchaser Ownership: Public
Tender Value: Refer Document
Purchaser's Detail
Name: Login to see tender_details
Address: Login to see tender_details
Email: Login to see tender_detailsLogin to see details
Tender Details
Modernization and renovation of part of the railway siding tracks (208-03-PZO) The subject of the order is to perform a comprehensive repair of the track surface on the indicated railway siding tracks, together with the replacement of structural elements of the surface and the execution of works accompanying, ensuring the required technical and operational parameters. The works will be performed in two stages, stage I by the end of 2026, stage II in 2027, the Ordering Party reserves the option of implementing only stage I. STAGE I by the end of 2026. List of track infrastructure for repair: · Track no. 116/12 from R112 to Z1; length 326m; construction length - 298m; surface: S49/Type6; IIB; K/S;T (type: rails, sleepers, fastening, ballast) · Track no. 117/13 from R108 to Z1.; length 352m; construction length - 298m; surface:Type6; IIB; K; T (type: rails, sleepers, fastening, ballast) · Track no. 118/14 from R107 to Z1.; długość 380m;długość budowlana - 326m; surface: S49/Type6; IIB;K/S; T (type: rails, sleepers, fastening, ballast) Scope of work to be performed: Track no. 116/12 length construction - 298m; Comprehensive repair of the track - Continuous replacement of wooden sleepers with reinforced wooden ones = 458 pieces together with the replacement of the K-type fastening set = 1832 sets - Continuous replacement of rails 6 with new S49 rails on the track length = 0.298 kmt = 596 m - Replacement of ballast ballast to a depth of 20 cm below the bottom edge of the sleeper along the track length = 268 m3 Track no. 117/13 construction length - 298 m Comprehensive track repair - Continuous replacement of wooden sleepers with reinforced wooden ones = 4...
Documents
Tender Notice