Procurement Summary
Country: USA
Summary: Mirror Vacuum Chambers & High Precision Mover Systems (Vcms) For Lcls
Deadline: 13 Nov 2015
Posting Date: 03 Nov 2015
Other Information
Notice Type: Tender
TOT Ref.No.: 4219523
Document Ref. No.: SLAC_110115(LL)-VCMS
Competition: ICB
Financier: Self Financed
Purchaser Ownership: -
Tender Value: Refer Document
CPV Classification
44423000 - Miscellaneous articles
Purchaser's Detail
Name: Login to see tender_details
Address: Login to see tender_details
Email: Login to see tender_details
Login to see detailsTender Details
Slac seeks vendors that can provide the following:
five (5) mirror vacuum chambers and high precision mover systems (vcms) for lcls
slac/lcls is seeking for a supplier of five mechanical systems as part of the hard x-ray mirror upgrade project.
Each system is composed by two main parts:
the mirror assembly (with mirror holder, bender, and interface plate) designed and realized by slac and not part of this requisition.
The vacuum chamber and mover system (including all the motions, motors, encoders and supports) to be designed and provided by the supplier.
The vcms has to be uhv compatible, hosting a 1 m long mirror (plus his holder, cooling and bender), and provide pointing stability better than 25 nrad rms.
The vendor is responsible for providing complete, tested systems and mechanics, delivered safely to slac, and to participate in the installation of the systems in their final locations.
The vendor is responsible for performing all necessary tests, to guarantee that all specifications and requirements are met.
The vendor is responsible for providing all necessary documentation to the slac team, to enable future connection, installation, and operation of the vcms, and to maintain them at their specified performance. The five systems will be identical, except for the deflection direction. In fact, all the mirrors deflect sideway, three in one direction and two in the other.
All the motions have to be performed by moving the entire chamber. Angular motion as large as 7 mrad with 50 nrad steps and transversal motion as large as 20 mm with 0.01 mm step are required.
The cooling and bending system is designed by slac. Slac will provide the exact location (with respect the mirror optical pole) and dimension of the flanges needed to accommodate them. Slac will also provide a detailed drawing of the interface plate and all the drawings the vendor will need to properly accommodate the mirror assembly into the vacuum chamber.
This is not a request for quote. Vendors interested in being considered as a potential source should identify themselves as an "interested party" via the fbo portal. Do not contact the subcontract administrator.
Slac national accelerator laboratory
menlo park, california 94025
united states
primary point of contact.:
lorenza s. Ladao,
sr. Subcontract administrator
[email protected] general information
66 -- instruments & laboratory equipment
naics code:
334 -- computer and electronic product manufacturing/334516 -- analytical laboratory instrument manufacturing