Procurement Summary
Country: France
Summary: Mi20 Project - Gab Phase Ii - Adaptation of Rer Line B Infrastructure - Civil Engineering Work to Bring Platforms into Compliance (Ufr 4V and 8V Zones)
Deadline: 11 Sep 2026
Posting Date: 30 Jul 2026
Other Information
Notice Type: Tender
TOT Ref.No.: 146209123
Document Ref. No.: 526474-2026
Competition: ICB
Financier: Self Financed
Purchaser Ownership: Public
Tender Value: Refer Document
CPV Classification
45234100 - Railway construction works
45200000 - Works for complete or part construction and civil engineering work
45110000 - Building demolition and wrecking work and earthmoving work
45223500 - Reinforced-concrete structures
45262522 - Masonry work
45223100 - Assembly of metal structures
45261420 - Waterproofing work
Purchaser's Detail
Name: Login to see tender_details
Address: Login to see tender_details
Email: Login to see tender_details
Login to see detailsTender Details
MI20 Project - GAB Phase II - Adaptation of the infrastructure of RER line B - Civil engineering work to bring the platforms of the Saint Rémy lès Chevreuse, Lozère, Courcelle sur Yvette and Antony stations (UFR 4V and 8V zones) into conformity under ITC (Interruption Temporary Traffic) MI20 Project - GAB Phase II - Adaptation of RER line B infrastructure - Civil engineering work to bring the platforms of Bourg la Reine station into compliance (UFR 4V and 8V zones) under ITE (Temporary Interruption of Operation) This consultation is part of the MI20 - GAB Phase II Project, aimed at adapting the infrastructure of line B of the RER to allow the putting into operation of the new MI20 rolling stock (Interconnected Equipment ordered in 2020). The new rolling stock, compliant with the FR3.3 gauge, requires the adaptation of several platforms in order to guarantee compliance with the railway gauge as well as the compliance of their altimetry, allowing independent access for people to reduced mobility (PRM) in UFR zones (4V and 8V). This consultation is broken down into two lots. These are ordinary works contracts at unit prices: Lot n°1: Adaptation of the platforms of the Saint Rémy lès Chevreuse, Lozère, Courcelle on Yvette and Antony under ITC (Temporary Traffic Interruption). Lot n°1 includes a firm phase covering the Lozère, Saint Rémy lès Chevreuse and Courcelle sur Yvette stations, as well as a...
Document Type: Contract Notice Reference Number: DHA_2026MOP21827 Contract Type: works Authority Type: pub-undert Doc Title: MI20 Project – GAB Phase II – Adaptation of RER line B infrastructure – Civil engineering works to bring the systems into compliance quais (zones UFR 4V et 8V) Dispatch Date: 2026-07-29 Publish Date: 2026-07-30 Submission Date: 2026-09-11
Documents
Tender Notice