Procurement Summary
Country : Czech Republic
Summary : Masaryk Public Library and Tourist Information Center Vsetin Č.P. 1356 - Roof Building Modifications
Deadline : 14 Jul 2025
Other Information
Notice Type : Tender
TOT Ref.No.: 122623692
Document Ref. No. :
Financier : Self Financed
Purchaser Ownership : Public
Tender Value : CZK 3500000.00
Purchaser's Detail
Name :Login to see tender_details
Address : Login to see tender_details
Email : Login to see tender_details
Login to see detailsTender Details
The supplier will carry out the construction of the roof of the building No. 1356. The description of the existing roof state of the existing roof of the building No. 1356 is insufficiently dropped with many places after the repair. A large number of puddles appear on the roof. The roof shows degradation of existing roofing with a larger a lot of defects. In the composition there is a large amount of water above and below the vapor barrier. It spreads both along the vapor barrier, but the defects in the vapor barrier get to concrete and spread here. The leakage is random, the connection of the suffering or the permeates. Expected construction procedure • Disassembly of the existing grip divorce. • Removing the existing coating - asphalt strips. • Disassembly of thermal insulation including heraklite. • Disassembling existing roof outlets, installing new inserts. • Disassembly of the existing attic. • After removing the existing roof cladding up to the existing concrete, the concrete surface will be perfectly cleaned and repaired. • Installation of a new attic including tinsmith elements. • Delivery and installation of new inserts • Newly designed penetration with ALP asphalt varnish, then the vapor barrier from the asphalt belt modified SBS with aluminum insert and glass bearing mat - th. 4 mm, further will be laid 1. Thermal insulation - polystyrene EPS 100 with thickness. 140 mm, further layers of thermal insulation will be laid - EPS 200 polystyrene pipes 200 with thickness. 80, 160, 240 and 320 mm and EPS 200 S 60, 40-60, 60-80 and 80-100 mm. The layers will be glued together with PUR adhesive for thermal insulation (non -breeze, One -component, on a polyurethane basis, curing in the interaction of air humidity). • Self -adhesive SBS modified belt thickness will be laid on the final gradient layer. 3 mm and then melted belt - final layer of waterproofing - SBS modified strip thickness. 5 mm with slate spread (non -heating fire). The whole composition must be add...
Documents
Tender Notice