Procurement Summary
Country: Belarus
Summary: Marketing Research to Identify Potential Contractors and Determine the Estimated Cost For: 1. Performing Operational Testing and Work on Adjusting the Water-Chemical Regime, ...
Deadline: 11 Mar 2026
Posting Date: 04 Mar 2026
Other Information
Notice Type: Tender
TOT Ref.No.: 137096504
Document Ref. No.: 2026-1314091
Competition: ICB
Financier: Self Financed
Purchaser Ownership: Public
Tender Value: BYN 1
Purchaser's Detail
Name: Login to see tender_details
Address: Login to see tender_details
Email: Login to see tender_details
Login to see detailsTender Details
Marketing Research to Identify Potential Contractors and Determine the Estimated Cost for: 1. Performing operational testing and work on adjusting the water-chemical regime, including pre-boiler treatment of steam boiler water - Utilizer Kup - 3100 Reg. No. 28/4-21-0167, operated at the facility of OJSC Mozyr Oil Refinery, Energy Production, Installation - Steam and Gas Turbine Power Plant (hereinafter referred to as Lot No. 1); 2. Performing operational testing and adjustment work on water-chemical Mode, Including Pre-Boiler Water Treatment of the Steam Boiler - Whb - 201 Recycler Reg. No. 28/4-21-0210, Operated at the Site of JSC Mozyr Oil Refinery, Hydrogen Production Installation for the Processing of Heavy Oil Residues (hereinafter referred to as Lot No. 2); 3. Performing operational and adjustment tests and work on adjusting the water-chemical regime, including pre-boiler water treatment of the Steam Generator (Reboiler) T-126N Reg. No. 28/4-21-0146, put into operation in 1999 at the Mozyr Oil Refinery OJSC, Petrochemical Production, Combined Fuel Oil Processing Plant, Section 100 - Fuel Oil Vacuum Distillation Plant (hereinafter referred to as Lot No. 3); 4. Performing operational adjustment tests and work on adjusting the water-chemical regime of the Steam Generator (Reboiler) T-202 Reg. No. 28/4-21-0147, Commissioned in 2002 at JSC Mozyr Oil Refinery, Petrochemical Production, Combined Fuel Oil Processing Unit, Section 200 - Tar Visbreaking Unit (hereinafter referred to as Lot No. 4); 5. Implementation of the Regime... Energy Other
Total estimated purchase cost: 1BYN Industry: Energy Other Brief description of the subject of purchase: Marketing research to identify potential contractors and determine the estimated cost for: 1. implementation of operational and commissioning testing and work on adjusting the water chemical regime, including pre-boiler water treatment of the steam recovery boiler KUP - 3100 reg. No. 28/4-21-0167, operated at the facility of OJSC Mozyr Oil Refinery, energy production, steam and gas turbine installation power plant (hereinafter referred to as LOT No. 1); 2. performing operational and adjustment tests and work on adjusting the water chemical regime, including pre-boiler water treatment of the steam recovery boiler WHB - 201 reg. No. 28/4-21-0210, operated at the facility of OJSC Mozyr Oil Refinery, hydrogen production unit for processing heavy oil residues (hereinafter referred to as LOT No. 2); 3. performance of operational and adjustment tests and work on adjusting the water chemical regime, including pre-boiler water treatment of the steam generator (reboiler) T-126N reg. No. 28/4-21-0146, put into operation in 1999 at OJSC Mozyr Oil Refinery, petrochemical production, combined fuel oil processing unit, section 100 – installation for vacuum distillation of fuel oil (hereinafter referred to as LOT No. 3); 4. performing operational and adjustment testing and work on adjusting the water-chemical regime of the steam generator (reboiler) T-202 reg. No. 28/4-21-0147, put into operation in 2002 at the Mozyr Oil Refinery OJSC, petrochemical production, combined...
Documents
Tender Notice