Procurement Summary
Country : Brunei Darussalam
Summary : Maintenance and Repair Works (Roof Leak and Waterproofing)
Deadline : 04 Jan 2022
Other Information
Notice Type : Tender
TOT Ref.No.: 61766524
Document Ref. No. : UBD/Q/291/2021-[G]
Financier : Self Financed
Purchaser Ownership : -
Tender Value : Refer Document
Purchaser's Detail
Name :Login to see tender_details
Address : Login to see tender_details
Email : Login to see tender_details
Login to see detailsTender Details
Tenders are invited for Term Contract One (1) Year Maintenance and Repair Works (Roof Leak and Waterproofing) at Universiti Brunei Darussalam
Investigate and repair roof leaks including replacement with new of roof aanelfroof tile, metal roofing and etc), roof fiashina defective ceiling joists, trusses Of any) and other member and to replace with new one. (1 (one) spot equal to 1 m2 area per location) including sealant application and all necessary accessories in accordance to Soecification A CONTROL PROCEDURE HEALTH. SAFETY. SECURITY & ENVIRONMENT
a) At ground floor to 1 storey height. S 100.00 M2
b) 2 story height and above. $ 200.00 M2
2 To remove and apply new sealant to alass ioint. aiucobond wall
ioint. metal roofina ioint and etc to S.O instruction aooivcation to
manufacture detail. All rate include the supply of labor, materials, tools, equipment, scaffolding, transport and other things deemed necessary to carried out the following works including removal of existing item and its accessories in accordance to Specification A CONTROL PROCEDURE HEALTH. SAFETY. SECURITY & ENVIRONMENT.
a) At ground floor to 1 storey height. S 50.00 M
b) 2 story height and above. $ 100.00 M
C GUTTER
1 Supply and Install
Install UPVC eaves Gutter and including mild steel bracket at 1.2m center joints in accordance with the manufacture's instruction including all necessary cutting and fixing. Size: 85mm width $ 30.00 M
Size: 100mm width $ 40.00 M
Size : 125mm width $ 50.00 M
D CEILING
1 Supply and install suspended ceiling similar to existing including extra hanger to follow existing slope and level.
2 To remove and apply new sealant to alass ioint. aiucobond wall
ioint. metal roofina ioint and etc to S.O instruction aooivcation to
manufacture detail. All rate include the supply of labor, materials, tools, equipment, scaffolding, transport and other things deemed necessary to carried out the following works including removal of existing item and its accessories in accordance to Specification A CONTROL PROCEDURE HEALTH. SAFETY. SECURITY & ENVIRONMENT.
a) At ground floor to 1 storey height. S 50.00 M
b) 2 story height and above. $ 100.00 M
C GUTTER
1 Supply and Install
Install UPVC eaves Gutter and including mild steel bracket at 1.2m center joints in accordance with the manufacture's instruction including all necessary cutting and fixing. Size: 85mm width $ 30.00 M
Size: 100mm width $ 40.00 M
Size : 125mm width $ 50.00 M
D CEILING
1 Supply and install suspended ceiling similar to existing including extra hanger to follow existing slope and level. E Soft Board
1 Size:
a) 2' x 2' $ 10.00 Per Pc.
b) 2' x 4' $ 16.00 Per Pc.
F Cement Board (including painting)
1 Size:
a) 2‘ x 2- $ 10.00 Per Pc.
b) 2' x 4' $ 16.00 Per Pc.
G Fiber cement Board
1 Size:
a) 2- x 2' 5 12.00 Per Pc.
b) 2' x4' $ 16.00 Per Pc.
H Supply and install non suspended ceiling using cement board $ 32.00 M2
including all necessary galvanized metal framing, fastener, hanger
to following existing slope and level including painting
WATER PROOFING
To take off, strip and remove of water proofing membrane roof
finish c/w all other related components ( all flat roof, side, bottom
of gutter etc and clear surface using appropriate solvent to bare
concrete and dispose off site and all necessary work required. Rate
shall also include to locate and seal all cracks with light weight
mortar.
30.00