Procurement Summary
Country: USA
Summary: Long Lead Time Material and Detail Design and Construction of Lpd 33-35 Amphibious Transport Dock Ship
Deadline: 19 Aug 2023
Other Information
Notice Type: Tender
TOT Ref.No.: 86775490
Document Ref. No.: N00024-23-R-2473
Financier: Self Financed
Purchaser Ownership: Public
Tender Value: Refer Document
Purchaser's Detail
Name: Login to see tender_details
Address: Login to see tender_details
Email: Login to see tender_details
Login to see detailsTender Details
Description
The Naval Sea Systems Command intends to issue solicitation to Huntington Ingalls Incorporated, acting through its Ingalls Shipbuilding division (HII), 1000 Access Road, Pascagoula, MS 39567 for Long Lead Time Material (LLTM) and Detail Design and Construction (DD&C) of the LPD 33-35 Amphibious Transport Dock Ships. The Lx(R) requirement that was developed to replace the retiring LSD 41/49 Class amphibious ships will be fulfilled with a SAN ANTONIO Class Flight II. LPD 30 is designated as the lead ship and LPD 33-35 are follow-on Flight II ships. As the designer, builder, and life cycle engineering and support provider of the entire SAN ANTONIO Class Flight I and the lead Flight II ship, HII is the only source with the requisite knowledge and experience required to construct LPD 33-35. Pursuing an alternate source through competition would result in significant duplication of costs and unacceptable delays due to the loss of design expertise and production efficiencies achieved on the previous 16 ships that cannot be recovered on LPD 33-35. No other vendor possesses the requisite facilities and qualified cadre of engineers, designers, and a construction workforce that can design, plan, construct, test, and deliver current and future amphibious ships. The primary purposes of the notice are to improve small business access to acquisition information and enhance competition by identifying subcontracting opportunities.
The proposed contract action is for supplies or services for which the Government intends to solicit and negotiate with only one source under authority of FAR 6.302-1. This notice of intent is not a request for competitive proposals. However, all responsible sources may submit a capability statement, proposal, or quotation within fifteen days after date of publication of this synopsis, which shall be considered by the Government. The Government will not reimburse respondents for any questions submitted or information provided becau...
Active Contract Opportunity
Notice ID : N00024-23-R-2473
Related Notice
Department/Ind. Agency : DEPT OF DEFENSE
Sub-tier : DEPT OF THE NAVY
Major Command : NAVSEA
Sub Command : NAVSEA HQ
Office : NAVSEA HQ
General Information
Contract Opportunity Type: Presolicitation (Original)
All Dates/Times are: (UTC-04:00) EASTERN STANDARD TIME, NEW YORK, USA
Original Published Date: Aug 04, 2023 07:53 am EDT
Original Response Date: Aug 19, 2023 05:00 pm EDT
Inactive Policy: 15 days after response date
Original Inactive Date: Sep 03, 2023
Initiative: None
Classification
Original Set Aside:
Product Service Code: 1905 - COMBAT SHIPS AND LANDING VESSELS
NAICS Code: 336611 - Ship Building and Repairing
Place of Performance: Pascagoula, MS 39567 USA
Documents
Tender Notice