Procurement Summary
Country: Belgium
Summary: Line 166: Y Neffe - Bertrix Commune of Houyet (Halte Royale D-Ardenne) Replacement of the Superstructure of the Bridge at Km 13.808 with Mixed Steel-Concrete Decks and a Frame Bridge and Consolidation Of...
Deadline: 23 Jun 2026
Posting Date: 23 May 2026
Other Information
Notice Type: Tender
TOT Ref.No.: 141907438
Document Ref. No.: 5753425030_pub01
Competition: ICB
Financier: Self Financed
Purchaser Ownership: Public
Tender Value: Refer Document
CPV Classification
45000000 - Construction work
Purchaser's Detail
Name: Login to see tender_details
Address: Login to see tender_details
Email: Login to see tender_detailsLogin to see details
Tender Details
Line 166: Y Neffe - Bertrix Commune of Houyet (Halte Royale d-Ardenne) Replacement of the superstructure of the bridge at km 13.808 with mixed steel-concrete decks and a frame bridge and consolidation of the pier in Lesse with a reinforced concrete belt. The present market is a works contract. This contract concerns (in not necessarily chronological order): A) Preliminary works -) Rental of adjacent land, -) Clearing and preparation of the access path to the bridge (via the path along the Iwoigne and the road to Neufchâteau N94 and/or by Houyet), -) Preparation of the access area in and around the Lesse and the construction ford, B) For the reinforcement of the pile in Lesse. -) Bringing and placing the materials and the cofferdam around the pile in phase (and movement if necessary), -) Clearing the foot of the pile in phase (clearing and excavations), -) Creation of anchors in the ground and in the masonry, -) Formwork, reinforcement and concreting of the reinforcement in phase, -) Removal and evacuation of the cofferdam. C) For the replacement of the metal decks with a reinforced concrete frame bridge (Tracks A and B). -) Preparatory earthworks, -) Installation of the bypass and safety system for pedestrians, -) Construction of the new concrete framework bridge reinforced under the working decks of tracks A and B, or next to them for later pushing, -) Partial backfilling between the old abutment and the new frame. -) Restoration of the path within the framework, -) Masonry of rubble and various rerigging, -) During the CTL (decommissioning of tracks A and B) - preparatory work and in particular the installation of cable to ensure the continuity of the return current, - removal of tracks A...
General purpose: Competition Specific purpose: Contract or concession - standard regime Initially dispatched at: 22/05/2026 Last dispatched at: 22/05/2026
Documents
Tender Notice
notices_f02bb20a-cd6c-492b-a8c5-52a0e566cd22.zip