Procurement Summary
Country : China
Summary : Land Soil Pollution Control and Remediation Project
Deadline : 30 Sep 2024
Other Information
Notice Type : Tender
TOT Ref.No.: 108205696
Document Ref. No. : 0724-2420S2703120
Financier : Self Financed
Purchaser Ownership : Public
Tender Value : Refer Document
Purchaser's Detail
Name :Login to see tender_details
Address : Login to see tender_details
Email : Login to see tender_details
Login to see detailsTender Details
Tenders are invited for Land Soil Pollution Control and Remediation Project
The Soil Pollution Treatment and Restoration of the Land Pollution Treatment and Restoration of the Project Environment and Engineering Supervision Bidding Announcement
The bidding document fee is RMB 500 / set and is non-refundable after sale
Construction scale: The Guangzhou Huacheng Glass Factory site is located at No. 26, Renhouzhi Street, Liwan District, Guangzhou, with a total area of 44, 908.84 m2. According to the "Soil Pollution Risk Assessment Report of Guangzhou Huacheng Glass Factory Site" (hereinafter referred to as the Risk Assessment Report): the soil pollution in this site is mainly total fluoride, 7 heavy metals (arsenic, antimony, mercury, cadmium, lead, nickel, cobalt), 6 polycyclic aromatic hydrocarbons (naphthalene, benzo [a] anthracene, benzo [b] fluoranthene, benzo [a] pyrene, dibenzo [a, h] anthracene, indeno [1, 2, 3-cd] pyrene) and petroleum hydrocarbons ( C10-C40 ); the maximum depth of contaminated soil remediation / control is 10m, the total remediation / control projection area is 37, 000 m2, and the remediation / control earthwork volume is 84, 764 m³ . The actual workload shall not be less than the aforementioned total remediation earthwork volume, and the final workload shall be based on the remediation plan filed with the competent ecological and environmental authorities.
Scope of Bidding: Engineering supervision and environmental supervision of soil pollution control and remediation of Guangzhou Huacheng Glass Factory, including but not limited to the entire scope of work of soil pollution control and remediation, covering the supervision and organization, coordination work, project pricing review and other related services from the survey, design, construction and warranty stages. At the same time, the supervisor must also participate in the preparation and planning of the early stage of construction according to the client's requirements, assist the client in formulating engineering management methods, and other early stage work required by the client
[Disclaimer: The above text is machine translated. For accurate information kindly refer the original document.]
Documents
Tender Notice