PIJT-HMEEN JTEHUOLTO OY has floated a tender for Kuutar-Sun Solar Power Plant Design and Implementation, Pijt-Hmeen Jtehuolto Oy. The project location is Finland and the tender is closing on 06 Apr 2019. The tender notice number is 2019-004914 Ilmoituksen tyyppiTämä ilmoitus on: Ilmoitus hankintamenettelyn keskeyttämisestä Keskeytettävän hankintailmoituksen numero 2019-002463 Han, while the TOT Ref Number is 31343294. Bidders can have further information about the Tender and can request the complete Tender document by Registering on the site.

Expired Tender

Procurement Summary

Country : Finland

Summary : Kuutar-Sun Solar Power Plant Design and Implementation, Pijt-Hmeen Jtehuolto Oy

Deadline : 06 Apr 2019

Other Information

Notice Type : Tender

TOT Ref.No.: 31343294

Document Ref. No. : 2019-004914 Ilmoituksen tyyppiTämä ilmoitus on: Ilmoitus hankintamenettelyn keskeyttämisestä Keskeytettävän hankintailmoituksen numero 2019-002463 Han

Competition : ICB

Financier : Self Financed

Purchaser Ownership : -

Tender Value : Refer Document

Purchaser's Detail

Purchaser : PIJT-HMEEN JTEHUOLTO OY
Procurement unit: Pijt-Hmeen Jtehuolto Oy
Business ID: 0937458-6
Contact: Jani Vehvilinen
Postal Address: Sapelikatu 7
Postcode: 15160
Town: Lahti
Country: Finland
Phone: 358447090949
Email address: jani.vehvilainen@phj.fi by Internet osoiyou (URL): http://www.phj.fi/ by
Finland
Email :jani.vehvilainen@phj.fi
URL :www.phj.fi/

Tender Details

Tender are invited for Kuutar-Sun Solar Power Plant Design and Implementation, Pijt-Hmeen Jtehuolto Oy
The Subject Of The Acquisition :
Purchase name: SUSPENSION DECLARATION: Design and implementation of the Kuutar solar power plant
Description of Acquisition: Pijt-Hmeen Jtehuolto Oy implements a solar power plant at the Kujala waste center in Lahti.tkalvokennoilla. The project includes the design of the solar power plant and the final structural layers and water collection systems for the landfill, the water network and the connections it requires, as well as the design and implementation of the inverter and transformer system, as well as the design and implementation of the automation and control system.As a father, the project includes the commissioning of a solar power plant and an initial five-year retention period. but the scope and target cost of the project will be specified at the stage of its development.The project is to study and develop the solar power plant's technological solutions as well as its implementation.and business model. The planned solution offers companies implementing it the opportunity to productize the concept and grow their own business.
Main item: Headquarters Construction work. (45000000-7)
: Headquarters Electric machines, appliances, equipment and consumablest; lighting. (31000000-6) Construction-related structures and accessories and other products (excluding electrical equipment). (44000000-0) Oil products, fuels, electricity and other sources of energy. (09000000-3) Installation services (except software). (51000000-9) Architectural, Construction, Engineeringnightclub and inspection services. (71000000-8) Drainage, waste management and remediation services, environmental services. (90000000-7)
Main place of purchase: Lahti (K398)
Duration of the contract: 1.5.2019 - 1.5.2024
The subject of the acquisition :
Purchase name: SUSPENSION DECLARATION: Design and implementation of the Kuutar solar power plant
Description of Acquisition: Pijt-Hmeen Jtehuolto Oy implements a solar power plant at the Kujala waste center in Lahti.tkalvokennoilla. The project includes the design of the solar power plant and the final structural layers and water collection systems for the landfill, the water network and the connections it requires, as well as the design and implementation of the inverter and transformer system, as well as the design and implementation of the automation and control system.As a father, the project includes the commissioning of a solar power plant and an initial five-year retention period. but the scope and target cost of the project will be specified at the stage of its development.The project is to study and develop the solar power plant's technological solutions as well as its implementation.and business model. The planned solution offers companie...

Documents

 Tender Notice