Summary : Kraftwerk Aue - Revision Machinengruppe 3 - Los Turbine
Deadline : 07 Jul 2025
Other Information
Notice Type : Tender
TOT Ref.No.: 120825272
Document Ref. No. : 381443-2025
Financier : Self Financed
Purchaser Ownership : Public
Tender Value : Refer Document
Purchaser's Detail
Name :Login to see tender_details
Address : Login to see tender_details
Email : Login to see tender_details
Login to see detailsTender Details
The Aue river power plant consists of a central, a three -field weir and a 300 m long, upper water side canal. In 2025 it is planned to revise and improve machine group 3. The Los Turbine Revision MG3 includes dismantling, revision, modernization Installation of an improved shaft seal, re -assembly and commissioning of the following turbine:
Type:
Chaplain bevel wheel pipe turbine
double -regulated
With translation gear
Nominal water quantity: 45 m3/s
Net falls: 5.60 m
Nominal output Turbine (excl. Gear): 2280 kW
Idea diameter: 2600 mm
Nominal speed Turbine: 146 rpm
(Middle impeller)
Min. Submission level: 351.42 m above sea level.
The generator revision is a separate.
Power plant Aue - Revision Machinengruppe 3 - Los Turbine
The Aue river power plant consists of a central, a three -field weir and a 300 m long, Upper water -side power plant channel. In 2025 it is planned to revise and improve machine group 3. The Los Turbine Revision MG3 includes die Disassembly, revision, modernization by installing an improved shaft seal, re -assembly and commissioning of the following turbine:
Type:
Chaplain bevel wheel pipe turbine
double -regulated
With translation gear
Nominal water quantity: 45 m3/s
Net falls: 5.60 m
Nominal performance turbine (excl. Gear): ...
Document Type: Contract Notice
Contract Type: supplies
Doc Title: Kraftwerk Aue - Revision Machinengruppe 3 - Los Turbine
Dispatch Date: 2025-06-12
Publish Date: 2025-06-13
Submission Date: 2025-07-07
Documents
Tender Notice