Procurement Summary
Country: Viet Nam
Summary: Khlcnt Phase 5 in 2025
Deadline: 07 Jul 2026
Posting Date: 23 Jul 2025
Other Information
Notice Type: Procurement Plan/GPN/PIN
TOT Ref.No.: 123216386
Document Ref. No.: 1288/QD-TĐAV
Competition: ICB
Financier: Self Financed
Purchaser Ownership: Public
Tender Value: Refer Document
Purchaser's Detail
Name: Login to see tender_details
Address: Login to see tender_details
Email: Login to see tender_details
Login to see detailsTender Details
KHLCNT phase 5 in 2025
GT - 07/2025: 24 -hour protection service for A Vuong hydropower project items, GT - 08/2025: Survey consultancy, fighting The upper price of the dam, assessing the water quality in the corridor grooves to consider the composition and content of the mineral in water soaked; Evaluate love water pipe system status; Surveying the current status of the background, heat slot; Surveying, evaluating RCC quality and preparing technical plan to repair RCC dam - Electricity A Vuong, GT - 09/2025: Replace elevators at A Vuong Hydroelectric Plant, GT - 10/2025: Design and install tool modules for testing for testing Equipment test before being replaced, GT - 11/2025: large repair of RCC - A Hydroelectricity System System
Details of bid invitation, GT - 12/2025: Procurement of 5 -seat pickup cars for A Vuong Hydroelectric Joint Stock Company, GT - 13/2025: Shopping for 29 -seat cars for A Vuong Hydroelectric Joint Stock Company, GT - 14/2025: Equipped with labor protection clothes for workers
Bidding details
The results of the contractor selection, GT - 15/2025: Buy civil liability insurance, material insurance, assistant driver's accidents and people sitting on the car, GT - 16/2025: Providing data, forecast news for KTTV Hydroelectric Prevention and Disaster Prevention of A Vuong Hydroelectric Project from September 1, 2025 to the end of August 31, 2026, GT - 17/2025: Repairing the first transport vehicle, GT - 18/2025: Providing maintenance services for shared software of EVN, GT - 19/2025: Deploying software collecting EVNHES measurement data at hydropower plant A Vuong, GT - 20/2025: Consulting surveys, evaluating the current situation and setting up technical plans to crack the concrete surface of the door to receive water - Thuy factory ...
[Disclaimer: The deadline date mentioned is tentative and provided for informational purposes only. This notice is a procurement forecast or general procurement plan, and not an active tender.
Suppliers are advised to refer to the original documents and contact the issuing authority directly for the official tender release date and further details.]
Documents
Tender Notice