Procurement Summary
Country : Viet Nam
Summary : Khlcnt Phase 5 in 2025
Deadline : 07 Jul 2025
Other Information
Notice Type : Tender
TOT Ref.No.: 122201263
Document Ref. No. : 1288/QD-TĐAV
Financier : Self Financed
Purchaser Ownership : Public
Tender Value : Refer Document
Purchaser's Detail
Name :Login to see tender_details
Address : Login to see tender_details
Email : Login to see tender_details
Login to see detailsTender Details
KHLCNT phase 5 in 2025
GT - 07/2025: 24 -hour protection service for A Vuong hydropower project items, GT - 08/2025: Survey consultancy, fighting The upper price of the downstream dam, evaluating the quality of water in the corridor grooves to consider the composition and content of minerals in the water soaked; Evaluate love water pipe system status; Surveying the current status of the background, heat slot; Surveying, evaluating RCC quality and preparing technical plan to repair RCC dam - Electricity A Vuong, GT - 09/2025: Replace elevators at A Vuong Hydroelectric Plant, GT - 10/2025: Design and install tool modules for testing for testing Equipment test before being put in replacement, GT - 11/2025: major repair of RCC - A Vuong Hydroelectric System System, GT - 12/2025: Procurement of 5 -seat pickup cars for A Vuong Hydroelectric Joint Stock Company, GT - 13/2025: Shopping for 29 -seat cars for A Vuong Hydropower Joint Stock Company, GT - 14/2025: equipment equipped with equipment Labor protective clothing for workers, GT - 15/2025: Buy civil liability insurance, vehicle physical insurance, assistant steering insurance and car seats, September 1, 2025 to the end of August 31, 2026, GT - 17/2025: Repairing vehicles in phase 1, GT - 18/2025: Providing maintenance services for shared software of EVN, GT - 19/2025: Deploying EVNHES measurement data collection software at A Vuong Hydroelectric Plant, GT - 20/2025: Survey and evaluation advice status ...
Documents
Tender Notice