Procurement Summary
Country: USA
Summary: ITB No. 26-2931-2JL - Water Treatment Facility - HVAC Improvements
Deadline: 24 Mar 2026
Posting Date: 17 Mar 2026
Other Information
Notice Type: Tender
TOT Ref.No.: 137944211
Document Ref. No.: IFB 113651-2
Competition: ICB
Financier: Self Financed
Purchaser Ownership: Public
Tender Value: Refer Document
Purchaser's Detail
Name: Login to see tender_details
Address: Login to see tender_details
Email: Login to see tender_detailsLogin to see details
Tender Details
ITB No. 26-2931-2JL - Water Treatment Facility - HVAC Improvements
Category : Construction
Closedate : 2026-03-24
Work Location : County of Henrico, VA Website: Pre-Bid Conference:See solicitation documents for optional prebid/proposal conference/site visit. Open Responses:See solicitation documents Public Opening information. Summary:The Work consists of all work required by the Construction Documents necessary for the HVAC Improvements project at the Henrico County Department of Public Utilities’ Water Treatment Facility (WTF) located at 10111 Three Chopt Road, Richmond, VA; and Raw Water Pump Station (RWPS) located at 1201 South Gaskins Road, Richmond, VA, including removal and disposal of ACU-8 and associated ACC-2, ACU-9 and associated ACC-3, ACU-10 and associated ACC-5, ACU-11 and associated ACC-6, ACU-7 and associated ACC-4, ACU-6 and associated ACC-1 and all associated refrigeration piping, piping accessories and supports serving the main water plant. Work at the main water plant also includes the removal and disposal of the air-cooled chiller (CHIL-1) located outside on grade. Work also consists of the removal and disposal of ACU-1 and associated ACC-1 and all associated refrigerant piping, piping accessories, and supports at the Raw Water Pumping Station as well as the removal and disposal of the through-the-wall air conditioner (WAC-1) serving the control room in the pumping station. All refrigerant must be recovered from existing systems and disposed of in compliance with local, state and federal regulations prior to systems demolition. All systems listed above will be replaced and the DDC system serving the Water Treatment Facility, Washwater/Sludge Pump Station, and the Raw Water Pump Station will be replaced in its entirety along with associated control components. Plumbing work includes the provision of floor drains in the lab space to serve the existing emergency plumbing fixtures. These drains will be tied into a new neutralization basin located in the interstitial space, and tied in parallel to the existi...
Documents
Tender Notice