Procurement Summary
Country: United Kingdom
Summary: Iso11 Fumigation Lobby Replacement Project - Civil Works and Cdm Principal Designer/Principal Contractor Role
Deadline: 23 Sep 2026
Posting Date: 07 Aug 2026
Other Information
Notice Type: Tender
TOT Ref.No.: 146737517
Document Ref. No.:
Competition: ICB
Financier: Self Financed
Purchaser Ownership: Public
Tender Value: Refer Document
CPV Classification
45000000 - Construction work
45200000 - Works for complete or part construction and civil engineering work
71247000 - Supervision of building work
71311000 - Civil engineering consultancy services
71311100 - Civil engineering support services
71320000 - Engineering design services
71322000 - Engineering design services for the construction of civil engineering works
79415200 - Design consultancy services
79933000 - Design support services
Purchaser's Detail
Name: Login to see tender_details
Address: Login to see tender_details
Email: Login to see tender_details
Login to see detailsTender Details
This opportunity (“Contract”) is for a single supplier to provide: 1. Civil Works and CDM Principal Designer/Principal Contractor Role for the ISO11 Fumigation Lobby Replacement Project. 2. Conversion of Structural Engineer-s drawings to Construction Drawings. 3. Liaison with Local Authority to ensure compliance with Building Control. This will include providing drawings and information as required by the Local Authority and hosting them during site visits. Fees for Building Control will be paid for by The Pirbright Institute. 4. Construction of a Temporary Biocontainment Wall which will allow the area to be externalised from ISO11 to enable construction works to take place. The wall shall provide a bioseal between the working area and the contained area. Suppliers must allow for works carried out close to this wall to be carried out with care and attention to prevent damage to the wall. 5. Strip out of existing fumigation chamber and autoclave. 6. Remove door between G48 & G44 (ISO8), brick up and render. 7. Remove the external door in G62, brick up and render. 8. Create opening into G49/G62 area after temporary containment barrier is in place. 9. Create new loading area in G49 / G62 area. This will include making good the floors, walls and ceiling to the same standards as ISO11 to maintain sealability. Remove and make good any raised door threshold so that there is smooth access to the fumigation lobby for pallet trucks. 10. Create space for new Fumigation Lobby and c...
Documents
Tender Notice