Procurement Summary
Country : Tajikistan
Summary : International or Local Consultant's Team/Certified Company to Evaluate the Technical Condition of the Ventilation Systems
Deadline : 21 Dec 2023
Other Information
Notice Type : Tender
TOT Ref.No.: 93752429
Document Ref. No. : TB-23-031
Financier : Other Funding Agencies
Purchaser Ownership : Public
Tender Value : Refer Document
Purchaser's Detail
Name :Login to see tender_details
Address : Login to see tender_details
Email : Login to see tender_details
Login to see detailsTender Details
Request for proposals are invited for International or Local Consultant's Team/Certified Company to Evaluate the Technical Condition of the Ventilation Systems in the National Tb Reference Laboratory (Nrl) in Dushanbe, Tajikistan and the Regional Tb Laboratory of Dehmoy, Sughd Region of Tajikistan
The Consultant-s team\Certified Company will be responsible for the following activities:
1. Check and evaluate of current technical status of the existing ventilation system:
1 Rooms
o Check directional airflows from “clean” to “dirty” areas using smoke pattern test,
o Verify the air changes per hour rate
o Assess room pressure cascade (check whether doors open inwards into the testing area or outward, and also evaluate the integrity of the seals on the doors and windows),
o Assess of the safety and authorized access to the laboratory (card access system, locker
room - function of interlock).
• Air Filters
o Perform filter capacity test (pressure drop),
Ductwork
o Evaluate physical integrity,
o Assess fire protection if available (flaps, sensors),
o Check variable air volume controller / constant air volume controller,
o Dryness and cleanliness,
o Air balancing record.
• 11 VAC Equipment {e.g.. heat inn/cool ini? units, .stacks and condensers)
o Physical integrity,
o Assessment of the function with detailed description,
o Dryness and cleanliness,
o No slime, mold, dirt, bird droppings or soot accumulations,
o Check function of cooling- and heating system
• Supply and Exhaust Air Fan
o Correct direction of rotation and rotation per minute (rpm),
o Pulley/belt tightness and wear,
o Speed control of air fans according pressure room,
o Guards in place,
o Assembly intact and clean,
o Minimal vibration,
o Acceptable noise level,
o No loose nuts and bolts,
o Adequate bearing lubrication (as indicated by temperature and vibration),
o Wire, electrical connections and insulation intact,
o Fan wheel correctly mounted and not worn or dirty,
o Check of frequency inverter,
o Check of airflow rate, air velocity, air change rate.
• Control system / BMS (building management system)
o Check the function of the entire control- and monitoring system,
o Check all sensors for temperature, speed, pressure, humidity
o Check alarm system and their indications
o Normal operation/ emergency power
o Emergency power/ normal operation
o BMS maintains operational set points during all scenarios and return to normal
operations
o Assessing UPS operational
Testing all alarms
o HVAC Failure Alarm
o Availability of air flow alarms showing if the room has gone positive under normal
conditions or if door is open for greater than 20 second
o Availability of visual indication for personnel to aware if the room is under positive
or negative pressure prior to entering into the lab
Documents
Tender Notice