Cross Icon
Cross Icon

International Consultant - Hydrological Engineer Tender - 27437090

The UNITED NATIONS DEVELOPMENT PROGRAMME has issued a Tender notice for the procurement of a International Consultant - Hydrological Engineer / Expert in Irrigation Canals in the Turkmenistan. This Tender notice was published on 09 Oct 2018 and is scheduled to close on 18 Oct 2018, with an estimated Tender value of Refer Document. Interested bidders can access detailed Tender information, eligibility criteria, and complete bidding documents by referencing TOT Ref No. 27437090, while the tender notice number is and Registering on the platform.

Expired Tender

Procurement Summary

Country: Turkmenistan

Summary: International Consultant - Hydrological Engineer / Expert in Irrigation Canals

Deadline: 18 Oct 2018

Posting Date: 09 Oct 2018

Other Information

Notice Type: Tender

TOT Ref.No.: 27437090

Document Ref. No.:

Competition: ICB

Financier: United Nations Secretariat

Purchaser Ownership: -

Tender Value: Refer Document

CPV Classification

79600000 - Recruitment services

Purchaser's Detail

Name: Login to see tender_details

Address: Login to see tender_details

Email: Login to see tender_details

Login to see details

Tender Details

Tenders are invited for International Consultant - Hydrological Engineer / Expert in Irrigation Canals.
Background
As problems of water management, energy consumption, land degradation (salinization), and agricultural productivity are all closely intertwined in Turkmenistan, so too are potential solutions. The project will address these problems through integrated activities, with a goal toward achieving multiple benefits in different areas. Thus improved water management will lead not only to greater water availability, but also to significant energy savings, avoided GHG emissions, and reduced salinization. Application of new renewable-energy solutions in water management will lead not only to avoided GHG emissions, but also to greater water availability in remote populated areas. This integrated approach will be practically applied and technically proven first at specific sites in the Akhal velayat, then replicated across the country through region-specific planning and outreach, as well as supporting policies and investment at the national level.
The project-s activities are organized into four components:
· Component 1 will introduce new technologies in irrigated agriculture and pumping for energy efficiency, water conservation, and sustainable land management (SLM);
· Component 2 will scale-up investment in new and expanded efficient water-management infrastructure;
· Component 3 will deliver local and region-specific planning and educational outreach for IWRM and SLM among farmers and water-sector designers and managers;
· Component 4 develops and supports implementation of policy reform for IWRM.
The first two components will constitute the technical foundation of the project. For agriculture and infrastructure, respectively, these components will identify, verify, and document the most promising ways to save water, increase energy efficiency, and reduce water-related root causes of land degradation in Turkmenistan. The components will generate technical and financial performance data and practical experience to be used to plan and provide necessary justification to scale-up public investment and technology deployment nationwide.
While the first two components define the technical opportunity and priorities for replication, the second two components will seek to carry actual replication out on a national scale. The third component supports replication from the bottom up via development of action plans at the regional and district levels across the country, as well as educational outreach and capacity-building among farmers and local water-management personnel. The fourth component will work from the top down, defining and implementing policies, programmes, and investment plans for integrated water management and SLM at the national level.
The need to reduce water losses and associated land salinization from canal infiltration extends across the entire country, at all levels of the water management system, from long-distance distribution to farms. The greatest potential for the project to generate rapid, cost-effective, large-scale results with canal linings lies on the domestic production side, where there are urgent untapped opportunities to update materials, increase output, and raise efficiency. The Ministry of Agriculture and Water Economy of Turkmenistan (MAWE) currently operates three factories - one each in the Akhal, Mary, and Dashoguz velayats. These facilities produce mostly reinforced concrete pipes and plates for canals.
This component will include some investment in needed equipment and facility upgrades. Its main focus, however, will be on technical assistance in formulating the products, preparing production lines, conducting field research and testing, and then planning and implementation of expanded production and installation. The UNDP/GEF project and MAWE will work jointly on field testing and demonstration of all new products.
New canal lining products will be documented with regard to production processes, technical performance, environmental benefits, and cost. Results and analysis will be compiled into a report, including recommendations and cost estimation by national and international experts for the most promising prospects for further investment at all three factories and installation in canals nationwide. This report will be presented to MAWE for consideration as a basis for budget proposals to the Cabinet of Ministers. Approval and implementation of such proposals is a major focus of Component 4.
The UNDP plans to recruit an International Consultant - Hydrological Engineer / Expert in Irrigation Canals to perform the actions outlined below for the EERE Project.
Duties and Responsibilities
In accordance with the above-mentioned objective of the assignment and under the supervision of the Project Manager and Portfolio Manager, the International Consultant (IC) will be tasked to perform the following duties and responsibilities:
· Action One: Read the relevant sections of the project document, reports of international and national consultants, project targets and indicators related to lining of irrigation canals as well as other relevant information provided by the project team. Develop a detailed work plan of the assignment to achieve the project targets for the canal lining.
· Action Two: Taking into account the international experience (with examples from some countries with similar climatic conditions like in Turkmenistan), provide an overview of different lining materials applied in water turbidity conditions varying from 0.5 g/l to 5 g/l.
· Action Three: Using own and/or international experience in the development and use of anti-filtration coatings of irrigation canals, carry out market research to determine the economic efficiency of the application of various types of anti-filtration materials of irrigation canals applicable to the conditions of Turkmenistan. Prepare a detailed list of technical data to be collected and obtained by the local experts on feasibility studies of canal lining options;
· Action Four: Based on data provided by project specialists and national experts including technical parameters of irrigation canals, conditions of their operation and Turkmenistan's capabilities to produce construction or other materials used or that can be used for lining of irrigation canals, prepare recommendations on the selection of the canal linings considering economic, ecological and technically feasible types and configurations of lining materials resistant to extreme climatic conditions in Turkmenistan as well as preliminary / approximate budget estimates for several options (at least 3 options);
· Action Five: Based on the technical, financial and constructability aspects of the proposed options, prepare recommendations on the purchase of the necessary equipment for the production of selected types of lining materials (polymer, concrete and/or others), with the maximum use of locally produced raw materials.
· Action Six: Provide recommendations for the preparation of tender documents, particularly on the technical part of the tender requirements, for the purchase of lining or raw materials and appropriate equipment / machinery to produce / apply lining materials at the pilot sites.
· Action Seven: Visit the project pilot sites, collect, review and analyze the existing data on the pilot region. Take measurements and get / request new data if needed.
· Action Eight: Provide recommendations to the National experts on methods of measuring the rates of canal-s infiltration losses and quantify the improvement of canals via pre-and post-rehabilitation testing. Conduct training for national water engineers and project team to test the infiltration losses using practical exercises on selected segments of the canal at pilot sites.
· Action Nine: Provide technical support during the implementation of the pilot construction projects, including instructions on construction technology, necessary equipment and machinery, procedures for changing the shape and installation of each material, depending on the features of particular sections of the project, total length, area, channel shape, cost, standards, by which these types of works should be done according to government standards, timetable or deadline, as well as the whole range of other parameters and conditions that all need to be determined before commencement of the construction. Advise on alternative solutions to reduce the volume of earth works. Prepare a detailed list of technical data to be collected by the local experts over the implementation of the pilot projects;
· Action Ten: Provide National experts with recommendations on the operation of lined canals in different periods of the year and on the methods for cleaning lined canals from deposits or weeds. Provide regular consultations, recommendations and methodological support to project-s National experts on the relevant project activities.
· Action Eleven: Prepare a detailed final report on the assignment, including challenges, lessons learned and recommendations for implementation of projects activities.

Documents

 Tender Notice


Request Demo
GiZ Tenders India

Procurement Documents for Turkmenistan

Access a comprehensive library of standard procurement documents specific to Turkmenistan. Here, you'll find all the essential forms, guidelines, and templates required for tender applications and submissions in Turkmenistan

Explore Procurement Documents for Turkmenistan


Want To Bid in This Tender?

Get Local Agent Support in Turkmenistan and 60 More Countries.

View All The Services


View Tenders By


Publish Tenders


Have Any Dispute With The Purchaser?