Procurement Summary
Country: USA
Summary: Intent to Sole Source - Change Order Modification for Drop Tower
Deadline: 23 Oct 2024
Posting Date: 16 Oct 2024
Other Information
Notice Type: Tender
TOT Ref.No.: 108713072
Document Ref. No.: W911QX24P0165P00001
Competition: ICB
Financier: Self Financed
Purchaser Ownership: Public
Tender Value: Refer Document
Purchaser's Detail
Name: Login to see tender_details
Address: Login to see tender_details
Email: Login to see tender_details
Login to see detailsTender Details
Description
Adding 10, 000-pound force (lbf.) dynamic impact load cell accessory option to the base versatile drop tower as described below:
A 10, 000lbf. dynamic load cell, with a calibration range over the 10, 000lbf range shall be needed for lower energy drop tower impact testing. This load cell will affix to the cross head of the MP Machinery High Energy Impact Drop tower detailed in contract order W911QX24P0165. This load cell will connect to the digital connector of MP Machinery High Energy Impact Tower and be read by the system-s software. The loadcell shall have internal threads to accommodate a ¾ inch-10 pitch, 1 ½ inch long impact striker adapter.
Active Contract Opportunity
Notice ID : W911QX24P0165P00001
Related Notice
Department/Ind. Agency : DEPT OF DEFENSE
Sub-tier : DEPT OF THE ARMY
Major Command : AMC
Sub Command : ACC
Sub Command 2 : ACC-CTRS
Sub Command 3 : ACC-APG
Office : W6QK ACC-APG ADELPHI
General Information
Contract Opportunity Type: Special Notice (Original)
Original Published Date: Oct 15, 2024 02:43 pm EDT
Original Response Date: Oct 23, 2024 11:59 am EDT
Inactive Policy: 15 days after response date
Original Inactive Date: Nov 07, 2024
Initiative: None
Classification
Original Set Aside:
Product Service Code: 6640 - LABORATORY EQUIPMENT AND SUPPLIES
NAICS Code: 334516 - Analytical Laboratory Instrument Manufacturing
Place of Performance: State College, PA 16803 USA
Documents
Tender Notice
Synopsis-Sole-Source-Non-RFI-version.doc
Salient-Characteristics-Redacted.pdf