Procurement Summary
Country: Canada
Summary: Installation of Underground Traffic Signal Plant
Deadline: 17 Jul 2026
Posting Date: 04 Jul 2026
Other Information
Notice Type: Tender
TOT Ref.No.: 144564055
Document Ref. No.: X21194
Competition: ICB
Financier: Self Financed
Purchaser Ownership: Public
Tender Value: Refer Document
Purchaser's Detail
Name: Login to see tender_details
Address: Login to see tender_details
Email: Login to see tender_detailsLogin to see details
Tender Details
SECTION IBrandon, Traffic Signals at 1st St at Richmond Ave.Underground work: Installation of concrete bases, pull pits, and electrical conduits. Per-cast foundations to be used where new foundation needs to go in the same spot as old foundation. Cutover work on the day of turn on.SECTION IIBrandon, Detection Upgrades at 6th St at Richmond AveUnderground work: Redirect preexisting 38mm loop conduit into pole 6. Pull in detection cable from cabinet to poles 6 (one cable) and 13 (one cable).Brandon, Detection Upgrades at 13th St at Richmond AveUnderground work: Redirect preexisting 38mm loop conduit into poles 5 and 10 Pull in detection cable from cabinet to poles 5 (one cable) and 10 (one cable).SECTION IIIBrandon, Detection Upgrades at 18th St at Kirkcaldy Dr.Underground work: Redirect preexisting 38mm loop conduit into poles 8 and 13. Pull in detection cable form cabinet to poles 8 (3 cables) and 13 (3 cables).
Reference Number : 0000324298 Location : Canada, Manitoba, Southwest Purchase Type : One Time Only- Delivery Date:2026/07/31 Description : SECTION IBrandon, Traffic Signals at 1st St at Richmond Ave.Underground work: Installation of concrete bases, pull pits, and electrical conduits. Per-cast foundations to be used where new foundation needs to go in the same spot as old foundation. Cutover work on the day of turn on.SECTION IIBrandon, Detection Upgrades at 6th St at Richmond AveUnderground work: Redirect preexisting 38mm loop conduit into pole 6. Pull in detection cable from cabinet to poles 6 (one cable) and 13 (one cable).Brandon, Detection Upgrades at 13th St at Richmond AveUnderground work: Redirect preexisting 38mm loop conduit into poles 5 and 10 Pull in detection cable from cabinet to poles 5 (one cable) and 10 (one cable).SECTION IIIBrandon, Detection Upgrades at 18th St at Kirkcaldy Dr.Underground work: Redirect preexisting 38mm loop conduit into poles 8 and 13. Pull in detection cable form cabinet to poles 8 (3 cables) and 13 (3 cables). :
Documents
Tender Notice