Procurement Summary
Country: Poland
Summary: Installation of a Ground Heat Pump at Primary School No. 1 in Wojkowice
Deadline: 10 Jul 2026
Posting Date: 26 Jun 2026
Other Information
Notice Type: Tender
TOT Ref.No.: 144071424
Document Ref. No.: 2026/BZP 00308559/01
Competition: ICB
Financier: Self Financed
Purchaser Ownership: Public
Tender Value: Refer Document
CPV Classification
45000000 - Construction work
45211350 - Multi-functional buildings construction work
45111000 - Demolition, site preparation and clearance work
45300000 - Building installation work
45311200 - Electrical fitting work
45320000 - Insulation work
43322000 - Dismantling equipment
45262300 - Concrete work
45331110 - Boiler installation work
Purchaser's Detail
Name: Login to see tender_details
Address: Login to see tender_details
Email: Login to see tender_detailsLogin to see details
Tender Details
Name of the order: Installation of a ground heat pump at Primary School No. 1 in Wojkowice. The subject of this order is the dismantling of the existing heat source, installation of a ground heat pump and modernization of the central heating installation and preparation of hot water. utility water. The entire investment was divided into two stages: Stage I of the investment - installation and commissioning of a ground heat pump along with the necessary accompanying infrastructure. Stage II of the investment: expansion of the system with 2 50 kW air heat pumps operating in the system hybrid, cooperating with a ground heat pump and an electric boiler as a peak source. As part of this procedure, it is envisaged to implement only the first stage of the investment, i.e. installation and commissioning of a ground heat pump with a capacity of 80 kW as the main source in basic operation of the heating system. This installation is to be adapted to operate in a low-temperature system with the possibility of further expansion in the future. The peak source will be two electric boilers with a total power of 48 kW, ensuring peak coverage heat demand during periods of increased load and hot water. The building's heat demand is 150 k...
Documents
Tender Notice