Procurement Summary
Country: Canada
Summary: Information Management System (Ims) Build
Deadline: 23 Jun 2026
Posting Date: 03 Jun 2026
Other Information
Notice Type: Tender
TOT Ref.No.: 142529813
Document Ref. No.: NAS-NWS-RFQ-0016
Competition: ICB
Financier: Self Financed
Purchaser Ownership: Public
Tender Value: Refer Document
Purchaser's Detail
Name: Login to see tender_details
Address: Login to see tender_details
Email: Login to see tender_details
Login to see detailsTender Details
The Contractor will design, supply, build, and configure a new fault‑tolerant Information Management System (IMS) environment to support Maximo, Eagle, and SharePoint for the North Warning System program, replacing the current interim setup. The work includes developing the system design, providing all required hardware, software, consumables, and licenses, and completing installation and base‑level configuration at the North Bay NWSCC and NWSSC facilities. The Contractor must deliver a fully redundant, high‑availability architecture with no single points of failure, along with all engineering drawings, documentation, training, and validation activities. The project also requires completion of Factory Acceptance Testing, System Acceptance Testing, commissioning, and a functional assessment of the deployed platform. All details are further outlined in Attachement A - Statement of Work.
Solicitation Type : RFQ - Request for Quotation (Formal) Reference Number : 0000323737 Location : Canada, Ontario Delivery Point : Hornell Heights, North Bay, ON P0H 1P0 Description : The Contractor will design, supply, build, and configure a new fault‑tolerant Information Management System (IMS) environment to support Maximo, Eagle, and SharePoint for the North Warning System program, replacing the current interim setup. The work includes developing the system design, providing all required hardware, software, consumables, and licenses, and completing installation and base‑level configuration at the North Bay NWSCC and NWSSC facilities. The Contractor must deliver a fully redundant, high‑availability architecture with no single points of failure, along with all engineering drawings, documentation, training, and validation activities. The project also requires completion of Factory Acceptance Testing, System Acceptance Testing, commissioning, and a functional assessment of the deployed platform. All details are further outlined in Attachement A - Statement of Work.
Documents
Tender Notice