Procurement Summary
Country: Poland
Summary: Improving Water and Sewage Management in the Leśnica Commune - Modernization of Power Supply and Control of Deep-Well Pumps in Zalesie Śląskie
Deadline: 12 Feb 2026
Posting Date: 05 Feb 2026
Other Information
Notice Type: Tender
TOT Ref.No.: 135107563
Document Ref. No.: 2026/BZP 00093827/01
Financier: Self Financed
Purchaser Ownership: Public
Tender Value: Refer Document
Purchaser's Detail
Name: Login to see tender_details
Address: Login to see tender_details
Email: Login to see tender_details
Login to see detailsTender Details
2. Scope of the subject of the order: 2.1. Engineering works: - Analysis of the existing installation and cabling - Calculations and selection of equipment according to current standards and regulations - Goodness of overcurrent protection in front of the switchgear - Eplan P8 project in paper and PDF form - Work schedule2.2 Delivery and construction of a new power supply switchgear: - Switchgear with selected dimensions or hydrophore switchboard - Manual operation switches on the switchboard door; On/Off/Auto - On lamps on the switchgear door - Taking into account the compressor power supply + compressor emergency socket - Signal acquisition for control and visualization (existing PLC and HMI) - Necessary equipment (rails, trays, device descriptions) - Wall cable routes, mountings, expansion plugs 2.3 Delivery of new water level measurement system: - Continuous, analog measurement 0-4m / 4..20 mA with PZH certificate - Spare MIN/MAX probes, float, with PZH certificate - Use of existing power supplies 2.4 Water counter acquisition system (PLC inputs): - Water meters based on supplied pulses potential-free - Free wires of existing wiring to be used - Water consumption reports (hourly/daily/weekly/monthly)...
Documents
Tender Notice