Procurement Summary
Country: Russia
Summary: Implementation of a Set of Measures (Design and Installation Work, Construction Work, Commissioning) for the Reconstruction of the 10 Kv Overhead Line F-3 Tps Inya-Vostochnaya from Op.1 to Op.2/37A for the Epu Transport Substation Construction of...
Deadline: 26 Aug 2026
Posting Date: 20 Aug 2026
Other Information
Notice Type: Tender
TOT Ref.No.: 147556312
Document Ref. No.: 32616299146
Competition: ICB
Financier: Self Financed
Purchaser Ownership: Public
Tender Value: Refer Document
Purchaser's Detail
Name: Login to see tender_details
Address: Login to see tender_details
Email: Login to see tender_details
Login to see detailsTender Details
Execution of a set of measures (design and installation work, construction work, commissioning) for the reconstruction of 10 kV overhead line F-3 TPS Inya-Vostochnaya from op.1 to op.2/37a for the power substation EPU Construction of the Sadovaya booster pumping station and clean water reservoirs designed by the transformer substation: NSO, Novosibirsk district, Station s/s
Publication of the notice: 08.18.26 05:11 (Moscow time) Acceptance of applications: until 08.26.26 10:00 (Moscow time) Consideration of the first parts of applications: until 01.09.26 (Moscow time) Consideration of the second parts of applications: until 09/08/26 (Moscow time) Start date and time for submission of additional price proposals: 09.09.26 (Moscow time) Summing up: 09/10/26 (Moscow time) Quantity: 1 Unit measurements : Conventional unit Digital code according to the OKPD2 classifier: 42.22.22.140 Description of the code according to the OKPD2 classifier: Repair work on local power and communication lines
Documents
Tender Notice