Procurement Summary
Country: Russia
Summary: Implementation of a Set of Measures (Design and Construction Work, Construction and Commissioning) for the Reconstruction of the 110 Kv Severnaya Substation (Replacement of the Mesh Fence Along the Perimeter of the Substation with a Length of 213...
Deadline: 20 May 2026
Posting Date: 12 May 2026
Other Information
Notice Type: Tender
TOT Ref.No.: 141129988
Document Ref. No.: 32615995895
Competition: ICB
Financier: Self Financed
Purchaser Ownership: Public
Tender Value: Refer Document
Purchaser's Detail
Name: Login to see tender_details
Address: Login to see tender_details
Email: Login to see tender_details
Login to see detailsTender Details
Implementation of a set of measures (design and construction work, construction work, commissioning) for the reconstruction of the 110 kV Severnaya substation (replacement of the mesh fence along the perimeter of the substation with a length of 213 m, with the installation of 4 swing double-leaf gates)
Publication of notice: 05/12/26 07:32:45 (Moscow time) Acceptance of applications: until 20.05.26 10:00:00 (Moscow time) Consideration of the first parts of applications: until 05.26.26 (Moscow time) Consideration of the second parts of applications: until 02.06.26 (Moscow time) Start date and time of the deadline for submitting additional price quotes offers: 03.06.26 (Moscow time) Summing up: 06/04/26 (Moscow time) Quantity: 1 Unit measurements : Conventional unit Digital code according to the OKPD2 classifier: 43.29.12.110 Description of the code according to the OKPD2 classifier: Work on installing fences, fences, protective railings and similar fencing
Documents
Tender Notice