Procurement Summary
Country : Slovenia
Summary : Implementation of Construction Works for the Realization of the Measure 'Risk Reduction for other Climate Conditioned Disaster - Avalanches' Within the C1
Deadline : 05 Aug 2025
Other Information
Notice Type : Tender
TOT Ref.No.: 122068415
Document Ref. No. : 435176-2025
Financier : Other Funding Agencies
Purchaser Ownership : Public
Tender Value : Refer Document
Purchaser's Detail
Purchaser : MINISTRY OF NATURAL RESOURCES AND SPATIAL PLANNING
ADDRESS: Dunajska cesta 48
Town: Ljubljana
Nuts-Code: SI041
Became Code: 1000
Phone: +38614787000
Slovenia
Email :gp.mnvp@gov.si
URL :https://www.gov.si/drzavni-organi/ministrstva/ministrstvo-za-naravne-vire-in-prostor/
Tender Details
Construction of construction work to realize the measure 'Risk Reduction for Other Climate Conditioned Disaster - avalanches' under component C1.k3.IF from a recovery and resilience plan.
The order is divided into 9 (nine) sets, namely:
-Sklop 1: Plaz Stovže: Objective Walls and Dispers of approximately 0.7 km
-Sklop 2: avalanche Stovže: Footbridge in the tailor with the attachment road
-Sklop 3: avalanche Stovže: Footbread at Matijevac
-Sklop 4: avalanche salt mud: drainage of torrential tributaries in the Povire part of Grajšek
-Sklop 5: avalanche Macedon: drainage CRAKA C in a river part of Jurcef
-Sklop 6: avalanche Gradišče: pilot wall and system drainage
-Sklop 7: Arching of Carinthia White: reinforced concrete barrier and 8 network barriers on the White stream
-Sklop 8: avalanche laze: drainage on the stream Bathroom
-Sklop 9: avalanche Laze: two sections of local road Gorenja vas - Poljane - Leskovica
The safety facilities represent 6 protective walls and the embankment. Everybody The facilities are located in the Upper and Lower Log pod Mangart. In the Lower Log there are protective walls 1 and 2 on the right bank of the Koritnica watercourse, and in the Upper Log walls 3, 5, 6, 7, and a protective embankment. The safety facilities in Zgornji Log are located upstream of the confluence of the tunnel and Koritnica. On the right bank of the tunnel, from the confluence of downstream from the bridge, there are safety walls 3, 4, 5 and 6 and a protective embankment, and on the left bank upstairs from the bridge the safety wall 7.
The new footbridge over Koritnica is intended d...
Document Type: Contract Notice
Number references: 430-11/2025-2560
Contract Type: Works
Authority Type: EU-EINS-BOD-AG
DOC Title: Implementation of construction works for the realization of the measure 'Reduction of risks for other climate conditioned accidents - avalanches' within the C1 odpornost
Dispatch Date: 2025-07-03
Publish Date: 2025-07-04
Submission Date: 2025-08-05
Documents
Tender Notice