Procurement Summary
Country: Netherlands
Summary: Hvc - Battery Energy Storage System (Bess) - Alkmaar
Deadline: 30 Sep 2025
Other Information
Notice Type: Tender
TOT Ref.No.: 125133343
Document Ref. No.: 556179-2025
Financier: Self Financed
Purchaser Ownership: Public
Tender Value: EUR 10000000
Purchaser's Detail
Name: Login to see tender_details
Address: Login to see tender_details
Email: Login to see tender_details
Login to see detailsTender Details
The design, engineering, construction, installation, commissioning and maintenance of a (at least) 15 MW (at connection point) and at least 30 MWh usable capacity Battery Energy Storage System connected to the existing grid connection of HVC Alkmaar on the available free fields. Based on a full-scope turnkey EPC contract, including the BESS (battery modules, inverters, transformers, control cabinets, auxiliary equipment, network equipment), civil works (foundation, digging, fencing, security), cabling supply and laying, connection to the grid connection and battery management system (BMS). The contract should include adequate quality and performance warranties and additionally an O&M contract including the maintenance of the BESS. The fencing, gates and camera security system of the BESS is also part of the EPC contract, to be taken over by HVC asset management at the take-over date. These items won-t be part of the O&M contract Also requested, but optional, is the delivery of an Energy Management System (EMS) with communication interface to monitor BESS usage in relation to the existing plant and the grid connection limits. The Client will provide required planning and construction permits from the municipality, and permits for the HDD drilling to the grid connection. The Client will provide access to the grid connection. Contractor will have to liaise with the authorized personnel of the Client to ensure safe and reliable connection of the BESS to the existing pla...
Document Type: Contract Notice
Reference Number: eef0b75e-8d2a-43c2-b3c1-b796e5a81110
Contract Type: works
Estimated Value: 10000000 - EUR
Authority Type: body-pl
Doc Title: HVC - Battery Energy Storage System (BESS) - Alkmaar
Dispatch Date: 2025-08-25
Publish Date: 2025-08-26
Submission Date: 2025-09-30
Documents
Tender Notice