Procurement Summary
Country: Czech Republic
Summary: Hot Water Supply of Světlíky Location - Hall E Incl. Vs
Deadline: 23 Jul 2026
Posting Date: 30 Jun 2026
Other Information
Notice Type: Tender
TOT Ref.No.: 144272823
Document Ref. No.:
Competition: ICB
Financier: Self Financed
Purchaser Ownership: Public
Tender Value: Refer Document
Purchaser's Detail
Name: Login to see tender_details
Address: Login to see tender_details
Email: Login to see tender_detailsLogin to see details
Tender Details
The subject of this contract is the realization of a hot water connection in a ductless, pre-insulated design, which solves the connection of the building Světlíky "E" to the CZT hot water network. In b. no. 1, new closing valves will be installed on the existing pre-insulated pipeline 2x DN 100/200 fittings, because the shut-off fittings that are installed on the route will be dismantled due to inappropriate location. They will be equipped with 2x KK DN 100 PN 25 VEXVE 100 (on the supply in the RP version). Pipeline replacement in b.no. 1 is in the length of the route 1.5 m. It is calculated here with an excavation with a width of 1000 mm, a length of 3 m and a depth of 1.5 m. 2, the existing shut-off fittings will be dismantled. Instead of them, a PI pipe bend will be inserted here. The route will continue to b.no. 3, where a "U" compensator with a 2 m extension will be installed. In b.no. 4 with the route bends the heat pipe at right angles, in B.No. 5 is refracted at an angle of 65° and in b.no. 6 is connected to the HPS area. A construction opening measuring approx. 1x2x2m will be left in the floor of the HPS, which will be filled in after the installation of the pipes, and the floor will be completed with the construction of the building. The subject of the order there is also a geodetic survey of the actual execution, including the preparation of the corresponding number of geometric plans as a basis for the deposit of the right of easement in the real estate cadastre and the construction of the construction site on site at the discretion of the contractor and discussion with the owner of land. The subject of the construction is also the complete supply and installation of the exchange station incl. parts of MaR, all according to the project. CPV subject: Pipes for district heating Construction work during pipe laying Installation and assembly of pipe systems Construction of exchange stations Technical-engineering services
Documents
Tender Notice