Procurement Summary
Country : Canada
Summary : Grit Removal, Peak Flow Management Facility
Deadline : 25 Mar 2019
Other Information
Notice Type : Tender
TOT Ref.No.: 31518325
Document Ref. No. : 491668
Competition : ICB
Financier : Self Financed
Purchaser Ownership : -
Tender Value : Refer Document
Purchaser's Detail
Purchaser : ALBERTA CAPITAL REGION WASTEWATER MANAGEMENT
Fort Saskatchewan, Alberta (Canada)
Canada
Email :bjacobs@acrwc.ab.ca
URL :http://www.acrwc.ab.ca/
Tender Details
B219a: Other Engineering Studies C219b: Engineering Services, N.E.S. C219a: Engineering Services C119f: Engineering Services - Buildings 5139B: Engineering Works, Not Elsewhere Specified C219c: Engineering Services R201dc: Services of Individuals - Engineering Response Submission: Alberta Capital Region Wastewater Commission 23262 Township Road 540 Fort Saskatchewan, Ab T8l 4A2 Attention: Brenda Jacobs Response Contact: Jacobs, Brenda Purchaser 23262 Township Road 540 Fort Saskatchewan, Alberta T8l 4A2 Tel: 780-416-9951 Email: Bjacobs@Acrwc.Ab.Ca Opportunity Description: - Compare Different Options in Terms of Costs, Rationalization, Benefit to the Entire Process, and Capital Planning Impact - Compare the Storm Tank and Vertex Grit Removal Technology and Grit Handling Method After Removal from Flow and Cleaning Procedures - Develop Risk Consideration and Work with Acrwc Staff for Risk Assessment - Analyze the Possibility of Deferring the Bioreactor Upgrade - Finalize the Capacities of Headworks Upgrade And/Or Peak Flow Management Facility - Finalize the Final Recommendation of Upgrade Scope - Integrate the Influent Pipeline Twinning, New Flow Meter, Dewatering Pump Replacement, Channel Aeration System Upgrade, Rock Trap Tank Removal and Dumping Station Addition to the Recommended Option - Complete Conceptual Design, Including Drawings, for the Determined Upgrade and Develop Design Base for Detail Design - Provide Detail Operation and Control Description on How to Operate the Recommended Installation to Effectively Eliminate the Grit, Adjust Feeding Flow Rate and Volume, and Balance the Contaminant Load. - Analyze System Hydraulic Condition to Ensure No Hydraulic Issues in the Future - Assess the Grit Capture Characteristics if Possible - Develop Implementation Staging Plan with Cost Estimates and Financial Model to Support - Organize and Participate Work Shops - Provide a Final Report Alberta Capital Region Wastewater Commission
Expires Date : 03.25.2019
Documents
Tender Notice