Procurement Summary
Country: Canada
Summary: Goulet-Doucet Watermain River Crossing Rehabilitation
Deadline: 24 Jul 2026
Posting Date: 14 Jul 2026
Other Information
Notice Type: Tender
TOT Ref.No.: 145093677
Document Ref. No.: 519-2026
Competition: ICB
Financier: Self Financed
Purchaser Ownership: Public
Tender Value: Refer Document
Purchaser's Detail
Name: Login to see tender_details
Address: Login to see tender_details
Email: Login to see tender_detailsLogin to see details
Tender Details
D2. SCOPE OF WORKD2.1 The Work to be done under the Contract shall consist of the rehabilitation of the Goulet-Doucet water main river crossing under the Seine River using a pulled-in-place Flexible Fabric Reinforced Pipe (FFRP) liner.D2.2 The major components of the Work are as follows:(a) Mobilization and site access;(b) Pipeline and inspection launch wye access excavations;(c) Disassembly and removal of launch wye and transition couplings;(d) Pipe dewatering as required to complete the work;(e) Pipeline cleaning, preparation, and inspection;(f) Rehabilitation of the pipeline using a FFRP liner;(g) Post lining inspection and pressure testing;(h) Installation of end seals and termination couplers at both access pits; and(i) Site restoration.D2.3 The following shall apply to the Work:(a) City of Winnipeg Green Building Policy: New City-Owned Buildings and major additions; http://clkapps.winnipeg.ca/DMIS/DocExt/ViewDoc.asp?DocumentTypeId=2&DocId=5989(b) Universal Design Policy; http://clkapps.winnipeg.ca/DMIS/DocExt/ViewDoc.asp?DocumentTypeId=2&DocId=3604
Reference Number : 0000327096 Location : Canada, Manitoba, Winnipeg Purchase Type : One Time Only- Delivery Date:2026/09/03 Description : D2. SCOPE OF WORKD2.1 The Work to be done under the Contract shall consist of the rehabilitation of the Goulet-Doucet water main river crossing under the Seine River using a pulled-in-place Flexible Fabric Reinforced Pipe (FFRP) liner.D2.2 The major components of the Work are as follows:(a) Mobilization and site access;(b) Pipeline and inspection launch wye access excavations;(c) Disassembly and removal of launch wye and transition couplings;(d) Pipe dewatering as required to complete the work;(e) Pipeline cleaning, preparation, and inspection;(f) Rehabilitation of the pipeline using a FFRP liner;(g) Post lining inspection and pressure testing;(h) Installation of end seals and termination couplers at both access pits; and(i) Site restoration.D2.3 The following shall apply to the Work:(a) City of Winnipeg Green Building Policy: New City-Owned Buildings and major additions; http://clkapps.winnipeg.ca/DMIS/DocExt/ViewDoc.asp?DocumentTypeId=2&DocId=5989(b) Universal Design Policy; http://clkapps.winnipeg.ca/DMIS/DocExt/ViewDoc.asp?DocumentTypeId=2&DocId=3604
Documents
Tender Notice