Procurement Summary
Country: Canada
Summary: Goc6811714-Goc6811718-Goc6811719 - Cs - Arc Flash Study
Deadline: 13 Aug 2026
Posting Date: 18 Jul 2026
Other Information
Notice Type: Tender
TOT Ref.No.: 145395138
Document Ref. No.: GOC6811714-GOC6811718-GOC6811719 - CS
Competition: ICB
Financier: Self Financed
Purchaser Ownership: Public
Tender Value: Refer Document
Purchaser's Detail
Name: Login to see tender_details
Address: Login to see tender_details
Email: Login to see tender_detailsLogin to see details
Tender Details
The purpose of this project is to complete an Arc Flash Hazard Assessment Study. An arc flash occurs when electrical current suddenly arcs through the air between two conductors, creating a potential workplace hazard. This study will analyze the risk of an arc flash occurring in relation to the building's electrical equipment, with the overall objective of significantly reducing the likelihood of such incidents.The Consultant will complete an Arc Flash Hazard Assessment Study, including: · Short Circuit Evaluation · Protective Device Interrupting Evaluation · Coordination Study and Recommended Protective Device Settings· Verification of existing arc flash labels and replacement or installation of new labels, as required. All labels are to be affixed to the applicable electrical equipment. Testing and labelling shall be completed in accordance with all applicable codes and standards for Arc Flash Labelling.
Solicitation Type : RFP - Request for Proposal (Formal) Reference Number : 0000327838 Location : Canada, North West Territories, NT - South Slave Region Delivery Point : Fort Simpson GOCB – 9606 100 St., Fort Simpson, NT Fort Smith GOCB – 149 McDougal Rd., Fort Smith, NT Hay River GOCB – 41 Capital Dr., Hay River, NT Purchase Type : One Time Only- Delivery Date:Dec 04, 2026 Description : The purpose of this project is to complete an Arc Flash Hazard Assessment Study. An arc flash occurs when electrical current suddenly arcs through the air between two conductors, creating a potential workplace hazard. This study will analyze the risk of an arc flash occurring in relation to the building's electrical equipment, with the overall objective of significantly reducing the likelihood of such incidents.The Consultant will complete an Arc Flash Hazard Assessment Study, including: · Short Circuit Evaluation · Protective Device Interrupting Evaluation · Coordination Study and Recommended Protective Device Settings· Verification of existing arc flash labels and replacement or installation of new labels, as required. All labels are to be affixed to the applicable electrical equipment. Testing and labelling shall be completed in accordance with all applicable codes and standards for Arc Flash Labelling.
Documents
Tender Notice