Procurement Summary
Country: Canada
Summary: Goc6474227 - Cs + Ddc Replacement
Deadline: 08 Sep 2026
Posting Date: 18 Aug 2026
Other Information
Notice Type: Tender
TOT Ref.No.: 147422469
Document Ref. No.: GOC6474227 – CS
Competition: ICB
Financier: Self Financed
Purchaser Ownership: Public
Tender Value: Refer Document
Purchaser's Detail
Name: Login to see tender_details
Address: Login to see tender_details
Email: Login to see tender_details
Login to see detailsTender Details
Scope of Work/Overview:This project will replace the existing end-of-life Andover DDC system and all existing Honeywell controls with a new BACnet-based Building Automation System (BAS/DDC), creating a single standardized controls platform for the facility. The work includes replacement of all supervisory and field controllers, network infrastructure, communication cabling, sensors, control devices, operator interfaces, and all associated field equipment required to deliver a fully functional, maintainable, and supportable automation system.The project also includes installation of a new Operator Workstation (OWS) in the Building Technician Office, providing centralized monitoring and control through graphical interfaces, trend logging, alarm management, scheduling, and reporting functions. Critical alarms will be integrated with an approved notification solution to ensure timely response to system events.
Solicitation Type : RFP - Request for Proposal (Formal) Reference Number : 0000330091 Location : Canada, Saskatchewan, All of Saskatchewan Purchase Type : One Time Only- Delivery Date:Aug 31, 2027 Description : Scope of Work/Overview:This project will replace the existing end-of-life Andover DDC system and all existing Honeywell controls with a new BACnet-based Building Automation System (BAS/DDC), creating a single standardized controls platform for the facility. The work includes replacement of all supervisory and field controllers, network infrastructure, communication cabling, sensors, control devices, operator interfaces, and all associated field equipment required to deliver a fully functional, maintainable, and supportable automation system.The project also includes installation of a new Operator Workstation (OWS) in the Building Technician Office, providing centralized monitoring and control through graphical interfaces, trend logging, alarm management, scheduling, and reporting functions. Critical alarms will be integrated with an approved notification solution to ensure timely response to system events.
Documents
Tender Notice