Procurement Summary
Country : United Kingdom
Summary : Gmca 1185 Salford Road Mrf
Deadline : 27 Jun 2025
Other Information
Notice Type : Tender
TOT Ref.No.: 121002301
Document Ref. No. : DN778497
Financier : Self Financed
Purchaser Ownership : Public
Tender Value : GBP 20000000.00
Purchaser's Detail
Name :Login to see tender_details
Address : Login to see tender_details
Email : Login to see tender_details
Login to see detailsTender Details
Under the national Resources and Waste strategy and requirements of Simpler Recycling policy, waste collection authorities (WCAs) that are part of the GMCA waste management arrangements will be required to make changes to current dry, mixed recycling (DMR) collections increasing the range of materials to be collected.
The existing materials recovery facility (MRF) at Longley Lane, Sharston does not have the capacity or the sorting equipment required to process these additional materials.
GMCA is therefore looking for to procure the design, build, installation, commissioning, and testing of new commingled dry recyclable material processing systems to be installed within the existing building at the Salford Road, Over Hulton, Bolton site to create a new Mechanical Recovery Facility (MRF).
The Salford Road site building has previously operated as an In-Vessel Composting facility and most recently a Bio Transfer Loading Station. The previous equipment has been removed and internal structure of the building refurbished to provide a clean operational space to accommodate new recyclable sorting equipment.
On completion of the works the site will be able to process commingled dry recyclable material collected from households across Greater Manchester, with plant outputs in the form of loose material (glass) or baled recyclable materials, with a capacity 140, 000 tonnes per annum of input commingled material.
The new plant is expected to operate across two x 8 hours sh...
Documents
Tender Notice