Procurement Summary
Country: USA
Summary: Gj Sutton Complex Demolition, San Antonio, Tx
Deadline: 11 Mar 2019
Posting Date: 08 Feb 2019
Other Information
Notice Type: Tender
TOT Ref.No.: 30451018
Document Ref. No.: 303-9-01042
Competition: ICB
Financier: Self Financed
Purchaser Ownership: -
Tender Value: Refer Document
CPV Classification
45111100 - Demolition work
Purchaser's Detail
Name: Login to see tender_details
Address: Login to see tender_details
Email: Login to see tender_details
Login to see detailsTender Details
Gj Sutton Complex Demolition, San Antonio, Tx
Response Due Date : 3/11/2019
Solicitation Description : SCOPE: In accordance with the provisions of Texas Government Code, Chapter §2269 Subchapter D, Competitive Sealed Proposal Method, and Rules and Procedures adopted by the Texas Facilities Commission (TFC), TFC is soliciting proposals from qualified general contractors to perform the G.J. Sutton Complex demolition at 321 Center Street, San Antonio, TX, for Project 18-009-8455. Work will include abatement, demolition and removal of buildings, basements, and foundations, capping of utilities, and related site work. ESTIMATED BUDGET: The estimated construction budget for the services described in the Request for Proposal (RFP) is three million dollars ($3, 000, 000).CONTRACT TERM: Construction is required to commence within fifteen (15) calendar days after the Notice to Proceed is issued. The contract period is estimated for a term of one hundred twenty (120) calendar days, however the duration shall be proposed by the Respondent. Work must be complete by December 31, 2019.STATEMENT OF WORK: Provide all materials, equipment, labor, coordination and supervisory activities necessary to complete demolition for the Project as is more fully described in the Attachment D, Project Manual, Attachment E, Project Drawings, Attachment F, Affected Soils Waste Management Plan, Attachment G, Demolition Assessment Report, Attachment H, Phase I Environmental Site Assessment and Attachment I, Construction Services Contract Template which include specifications, drawings, and other contract documents, prepared by Architect/Engineers (A/E) and TFC. The scope of work includes, but is not limited to, site preparation and security; demolition and removal of buildings, basements, foundations and flatwork; tree protection; underground utility capping; removal and delivery of salvageable equipment to TFC facilities; removal of historical artifacts; asbestos abatement; backfill and compaction of excavation; grading and planting the site; and reconstruction of the perimeter sidewalks. Coordination with the City of San Antonio Right of Way Management Department for all sidewalk and street closures, as well as payment of related permit fees will need to be covered in the base bid total.MANDATORY PRE-PROPOSAL CONFERENCES: The mandatory pre-proposal conferences are scheduled for Thursday 2/14/2019 @ 9:00 AM, and Wednesday 2/20/2019 @ 9:00 AM. The location of the pre-proposal conferences is the G.J. Sutton Building, 321 Center Street, San Antonio, TX. The parking lot is accessible only from the E. Crockett Street side. Check-in with security in the lobby. Respondents must attend at least one of the two scheduled pre-proposal conferences. TFC shall reject proposals submitted by contractors that did not attend one of the mandatory pre-proposal conferences.Site V...
Documents
Tender Notice