Procurement Summary
Country: Switzerland
Summary: General Planner Sia 32-53 for Compensation System in the Uw Mühleberg
Deadline: 23 Jun 2026
Posting Date: 13 May 2026
Other Information
Notice Type: Tender
TOT Ref.No.: 141175262
Document Ref. No.: 327792-2026
Competition: ICB
Financier: Self Financed
Purchaser Ownership: Public
Tender Value: Refer Document
CPV Classification
71000000 - Architectural, construction, engineering and inspection services
71313000 - Environmental engineering consultancy services
71320000 - Engineering design services
71323100 - Electrical power systems design services
71334000 - Mechanical and electrical engineering services
71351000 - Geological, geophysical and other scientific prospecting services
71356300 - Technical support services
71356400 - Technical planning services
Purchaser's Detail
Name: Login to see tender_details
Address: Login to see tender_details
Email: Login to see tender_detailsLogin to see details
Tender Details
General planner SIA 32-53 for compensation system in the UW Mühleberg The 380/220 kV Mühleberg substation is located in the municipality of Mühleberg in the canton of Bern. The substation mentioned was put into operation in 2012 and is located in terms of buildings, Switchgear, transformer and auxiliary systems in good condition. The aim of the project is to set up a compensation choke, also called a variable shunt reactor (VSR), including the necessary infrastructure. At the same time the complete Secondary technology, telecommunications and ancillary systems for the 380 kV and 220 kV systems renewed. In 2025, a preliminary project (SIA 31) was developed for this project with various variants. The variant decision was made in 2026 pleases. This tender is intended to procure the general planner for SIA phases 32 - 53 for the planning and coordination of this project, with SIA phases 51 - 53 being awarded as an option. In addition to the specialist scope of services in In addition to his area of responsibility, the general planner also takes over the overall supervision and coordination of all departments involved, including associated interfaces, as overall manager in the sense of SIA 103. The following sub-areas are from Organize general planner yourself: * Management and coordination of all departments involved including interfaces * Engineering and planning in the subproject - primary technology * Engineering and planning in the subproject - ...
Document Type: Contract Notice Contract Type: services Doc Title: General planner SIA 32-53 for compensation system in the UW Mühleberg Dispatch Date: 2026-05-12 Publish Date: 2026-05-13 Submission Date: 2026-06-23
Documents
Tender Notice