Procurement Summary
Country: USA
Summary: Fy27 Services 1X Spill Prevention, Control, and Countermeasure Spcc Plan
Deadline: 21 Oct 2026
Posting Date: 22 Oct 2026
Other Information
Notice Type: Tender
TOT Ref.No.: 151277137
Document Ref. No.: 36C24227P0073
Competition: ICB
Financier: Self Financed
Purchaser Ownership: Public
Tender Value: Refer Document
Purchaser's Detail
Name: Login to see tender_details
Address: Login to see tender_details
Email: Login to see tender_detailsLogin to see details
Tender Details
The Veterans Health Administration, Network Contracting Office 02 intends to solicit from a single source IAW FAR 13.106(b) to obtain a contract for: It s Five-Year Review, Evaluation, and Update of the Spill Prevention, Control, and Countermeasure (SPCC) Plan for the VA Hudson Valley Health Care System (VAHVHCS) at Castle Point Campus (CPC) and Montrose Campus (MC). The SPCC program is a regulatory framework designed to prevent oil discharges into U.S. navigable waters and adjoining shorelines by requiring facilities to implement prevention, control, and response measures. The VA Hudson Valley Health Care System is mandated by 40 CFR 112.5(b) to review and evaluate its SPCC Plans for Castle Point Campus and Montrose Campus every five years. The last update to the SPCC Plan was completed in 2021.
Period of Performance (POP) (estimated): 10/22/2026 through 09/30/2027 with provision of (0) option years. All work to begin immediately upon receipt of a contract.
Requirement Description:
The Spill Prevention, Control, and Countermeasure (SPCC) Plan must be a written, management-approved document detailing procedures, control measures, and countermeasures to prevent and respond to oil discharges. The core requirement of such plan includes but is not limited to and must follow good engineering practices and comply with 40 CFR Part 112 regulations, or provide equivalent environmental protection if deviations are necessary (40 CFR 112.7, 112.3)Â
Certification:Â Plans must be certified by a licensed Professional Engineer (PE) unless the facility qualifies for self-certification under the qualified facility criteria. Certification ensures that the plan meets regulatory and engineering standards (40 CFR 112.3, 112.7)Â
Plan Content:Â SPCC Plans must address three main areas:
Operating Procedures:Â Procedures to prevent oil spills during normal facility operations, including handling, storage, and transfer of oilÂ
Control Measures:Â Physical containment s...
Documents
Tender Notice
Documents.zip