Procurement Summary
Country: USA
Summary: Fy26 Sabineneches Waterway, Texas Maintenance Dredging
Deadline: 30 Apr 2026
Posting Date: 14 Apr 2026
Other Information
Notice Type: Tender
TOT Ref.No.: 139494950
Document Ref. No.: W912HY26BA002
Competition: ICB
Financier: Self Financed
Purchaser Ownership: Public
Tender Value: Refer Document
Purchaser's Detail
Name: Login to see tender_details
Address: Login to see tender_details
Email: Login to see tender_detailsLogin to see details
Tender Details
Pre-Solicitation Synopsis
W912HY26BA002
The U. S. Army Corps of Engineers, Galveston District Office requires a contract for the FY26 Sabine-Neches Waterway Maintenance Dredging. Unrestricted Procurement.
THE WORK CONSISTS OF:
1. Maintenance Dredging of the Sabine-Neches Waterway (SNWW) channel. Schedule 1 includes dredging of approximately 953, 000 cubic yards (CY) of the Sabine-Neches Waterway Sections 89A and 90-93. Option 1 is for dredging SNWW Section No. 305 for approximately 985, 000 CY. Option 2 is for dredging SNWW Section No. 706 for approximately 215, 000 CY. Option 3 is for dredging SNWW Section No. 58 &54 for approximately 558, 000 CY. Option 4 is for dredging SNWW Section Nos. 300 to 305 and Nos. 53A and 53B for a total of approximately 347, 500 CY.
2. This contract is not subject to environmental windows. All material from this project will be placed within nearby placement areas along the SNWW in addition to beneficial use sites (BU) for Schedule 1 and Option 1.
3. Completion Time for Schedule No. 1 for this project is estimated at 407 calendar days after receipt of the Notice to Proceed. Completion Time for Option No. 1 for this project is estimated at 300 additional calendar days onto the period of performance after receipt of the Notice to Proceed. Completion Time for Option No. 2 for this project is estimated at 25 additional calendar days onto the period of performance after receipt of the Notice to Proceed. Completion Time for Option No. 3 for this project is estimated at 47 additional calendar days onto the period of performance after receipt of the Notice to Proceed. Completion Time for Option No. 4 for this project is estimated at 54 additional calendar days onto the period of performance after receipt of the Notice to Proceed. If the contractor fails to complete the work within the time specified, the contractor shall pay liquidated damages to the Government in an amount to be determined for each calendar day of delay until the...
Notice ID: w912hy26ba002
Department/Ind. Agency: dept of defense
Sub-tier: dept of the army
Office: w076 endist galveston
Product Service Code: z1kb - maintenance of canals
NAICS Code: 237990 - Other Heavy and Civil Engineering Construction
Inactive Dates: may 15, 2026
Inactive Policy: 15 days after response date