Procurement Summary
Country: Canada
Summary: Full Replacement of Ahu System at Traffic Building--Construction Services
Deadline: 25 May 2026
Posting Date: 02 May 2026
Other Information
Notice Type: Tender
TOT Ref.No.: 140556007
Document Ref. No.: GOC3691504-CT
Competition: ICB
Financier: Self Financed
Purchaser Ownership: Public
Tender Value: Refer Document
Purchaser's Detail
Name: Login to see tender_details
Address: Login to see tender_details
Email: Login to see tender_details
Login to see detailsTender Details
Full Replacement of AHU System at Traffic Building, Abbotsford Border Crossing The Scope of Work includes, but not limited to: Mechanical Work: Work includes replacement of existing condensing units CU-1 (18-ton) and CU-2 (8.7-ton) on the roof and replacement of associated AHU-1 and AHU-2 in the third-floor mechanical room, including all related piping, ductwork, insulation and controls, as shown on the Mechanical Drawings. Electrical Distribution Upgrade: As per Electrical Set of DrawingsContractor is required to provide temporary heating, cooling and ventilation with a rental unit during the system switchover.All disruptive work (including but not limited to, noise, dust, equipment shutdown, hazmat abatement, etc.) must be scheduled afterhours. Please see detailed scope of work in Attachment 4-List of Specifications and Drawings.
Solicitation Type : ITB - Invitation to Bid (Formal) Reference Number : 0000321060 Location : Canada, British Columbia, Vancouver, Coast & Mountains Delivery Point : 2 Sumas Way Highway 11, Abbotsford, BC Purchase Type : One Time Only- Delivery Date:Feb 26, 2027 Description : Full Replacement of AHU System at Traffic Building, Abbotsford Border Crossing The Scope of Work includes, but not limited to: Mechanical Work: Work includes replacement of existing condensing units CU-1 (18-ton) and CU-2 (8.7-ton) on the roof and replacement of associated AHU-1 and AHU-2 in the third-floor mechanical room, including all related piping, ductwork, insulation and controls, as shown on the Mechanical Drawings. Electrical Distribution Upgrade: As per Electrical Set of DrawingsContractor is required to provide temporary heating, cooling and ventilation with a rental unit during the system switchover.All disruptive work (including but not limited to, noise, dust, equipment shutdown, hazmat abatement, etc.) must be scheduled afterhours. Please see detailed scope of work in Attachment 4-List of Specifications and Drawings.
Documents
Tender Notice