Procurement Summary
Country: Poland
Summary: For the Performance of Design, Electrical Installation and Software Works in the Lubień Mine, Regarding the Replacement of Equipment, Cabling and the Installation of a New Control System for the Secondary Crushing Plant/Equipment...
Deadline: 20 Jul 2026
Posting Date: 27 Jun 2026
Other Information
Notice Type: Tender
TOT Ref.No.: 144106646
Document Ref. No.:
Competition: ICB
Financier: Self Financed
Purchaser Ownership: Public
Tender Value: Refer Document
Purchaser's Detail
Name: Login to see tender_details
Address: Login to see tender_details
Email: Login to see tender_detailsLogin to see details
Tender Details
For the performance of design, electrical installation and software works in the Lubień mine, regarding the replacement of equipment, cabling and the installation of a new control system for the secondary crushing plant / feeder equipment in the PWE03 tunnel PT14 REQUEST FOR OFFERSubject of the orderI invite you to submit a price offer for the expansion and modernization of the control system of the Materials Processing Plant (ZPM) KB LubieńSubject of the order: Expansion and modernization of the control system of the Materials Processing Plant (ZPM) Materiałów (ZPM) KB Lubień1. Introduction and Purpose of the Project The purpose of the order is to perform the full scope of design, electrical installation and programming works in the Lubień Mine. The investment includes the modernization of the technological system of the secondary crushing plant - from feeders in the PWE03 tunnel to the PT14 conveyor. The modernization aims to optimize control, improve failure diagnostics (separation of overload signals and emergency stops) and modernize the operator station by implementing a system visualization.2.Detailed Scope of WorkThe contractor will be responsible for the implementation of turnkey tasks, which include:2.1. Design and Disassembly Work · Preparation of complete technical and as-built documentation · Dismantling of the existing cabling, accessories and current equipment of the plant's switchgear.2.2. Electrical Work and Equipment Delivery Modernization of the switchgear: Installation of power and control equipment (preferred manufacturers: Eaton, Rittal, Finder) in existing cabinets switchboard of the plant. o Replacing the central unit: Replacement of the current CPU in the RP2 switchboard with a new Siemens S7/300 controller. o Drive systems: Delivery and installation of inverters dedicated to the gutters in the tunnel. § Cabling: Installation of new...
Documents
Tender Notice