Procurement Summary
Country: USA
Summary: Florissant Golf Club Irrigation
Deadline: 21 Jul 2026
Posting Date: 16 Jun 2026
Other Information
Notice Type: Tender
TOT Ref.No.: 143358332
Document Ref. No.: 25-0259-PR
Competition: ICB
Financier: Self Financed
Purchaser Ownership: Public
Tender Value: Refer Document
Purchaser's Detail
Name: Login to see tender_details
Address: Login to see tender_details
Email: Login to see tender_details
Login to see detailsTender Details
General work description:The work included under this bid shall consist of furnishing all labor, supervision, materials, equipment, tools, transportation, testing, documentation, and incidentals necessary to complete the installation of a new golf course irrigation system at Florissant Golf Club in accordance with the project plans, specifications, and applicable codes and standards.The project generally includes, but is not limited to, the following:Installation of a complete new Rain Bird Integrated Control (“IC”) irrigation system throughout the golf course property.Installation of new HDPE mainline and lateral piping systems, including all required fittings, fusion work, isolation valves, drains, air/vacuum relief valves, valve boxes, swing joints, quick couplers, grounding components, and related appurtenances.Installation of Rain Bird IC sprinkler heads for greens, tees, fairways, and perimeter areas as identified in the plans and specifications.Installation of Rain Bird CirrusPro Central Control System, integrated control interface equipment, surge protection devices, rain shutdown components, Maxi wire communication cable, grounding systems, and all associated electrical and communication components.Removal and disposal of existing irrigation components as required to facilitate installation of the new system.Trenching, vibratory plowing, boring, bridge crossings, backfilling, compaction, sod replacement, restoration, cleanup, and repair of disturbed areas.Maintenance of operation of the existing irrigation system during construction as required by the Golf Course Superintendent.Coordination of construction sequencing to maintain golf course operations, including keeping all but one hole open during construction and completing each hole before proceeding to the next.Field coordination with staking provided by the Designer and preparation of complete as-built documentation identifying pipe routing, wiring, valves, splices, control components, and related infr...
Documents
Tender Notice