Procurement Summary
Country: Hungary
Summary: Flood Peak Reduction Reservoir Construction in Gödreszentmárton
Deadline: 31 Mar 2026
Posting Date: 20 Mar 2026
Other Information
Notice Type: Tender
TOT Ref.No.: 138178033
Document Ref. No.: 196156-2026
Competition: ICB
Financier: Self Financed
Purchaser Ownership: Public
Tender Value: Refer Document
CPV Classification
45240000 - Construction work for water projects
45111000 - Demolition, site preparation and clearance work
45112700 - Landscaping work
45243510 - Embankment works
45246000 - River regulation and flood control works
45246400 - Flood-prevention works
45247000 - Construction work for dams, canals, irrigation channels and aqueducts
45247112 - Drainage canal construction work
45247230 - Dyke construction work
45247270 - Reservoir construction works
71245000 - Approval plans, working drawings and specifications
71320000 - Engineering design services
Purchaser's Detail
Name: Login to see tender_details
Address: Login to see tender_details
Email: Login to see tender_detailsLogin to see details
Tender Details
Within the scope of the contract, the project entitled "Construction of flood peak reduction reservoirs in the operational area of the Southern Transdanubian Water Directorate, construction of the Gödreszentmárton reservoir" Construction of the Dombvidéki reservoir in Gödre, on the border of Baranyajenő village, 8+150 km section of the Gödrei watercourse in the section above the valley closure dam. The reservoir can be realized with a significant storm storage capacity, its storage capacity at flood water level is 601, 819.6 m3. Containment of floods coming from the Gödrei watercourse provides. The design of the reservoir with a constant water level enables its complex usability (flood peak reduction, water retention, water storage, welfare utilization, agricultural utilization). The planned interventions: - 375 m Völgyzáro dam construction: construction of an earth dam from local material - 1024 m Construction of a long embankment: construction of a water retaining embankment from local material - Construction of a pipe lock in a longitudinal embankment - Construction of 1 Water level retaining and draining structure (central structure): a combined function flood level control structure construction with a reinforced concrete structure, steel blocking and moving equipment, the possibility of passive blocking, an access bridge and other additional facilities - 1 piece of the Vésáraspaző artefact and the construction of the related tide-rearing channel: the artefact is reinforced concrete sealing teeth between, it is made with a stone cover laid in concrete, in the fore and aft part of the art object, as well as in the tidal channel, a RENO mattress and a GABION basket are made of bed protection - Reservoir arrangement: humus removal, soil...
Document Type: Contract Notice Reference Number: EKR001968222025 Contract Type: works Authority Type: body-e.g Doc Title: Flood peak reduction reservoir construction in Gödreszentmárton Dispatch Date: 2026-03-19 Publish Date: 2026-03-20 Submission Date: 2026-03-31
Documents
Tender Notice