Procurement Summary
Country: Canada
Summary: Fisher River Cree Nation - Goldeye Lake Subdivision Phase 1
Deadline: 19 Jun 2026
Posting Date: 30 May 2026
Other Information
Notice Type: Tender
TOT Ref.No.: 142329028
Document Ref. No.: F-338.53
Competition: ICB
Financier: Self Financed
Purchaser Ownership: Public
Tender Value: Refer Document
Purchaser's Detail
Name: Login to see tender_details
Address: Login to see tender_details
Email: Login to see tender_detailsLogin to see details
Tender Details
The Fisher River Cree Nation is calling tenders for the Goldeye Lake Drive Subdivision - Phase 1 project.Sealed tenders will be received up to 11:00 a.m. (prevailing Winnipeg time) on June 19, 2026 at the office of JR Cousin Consultants Ltd., 91A Scurfield Blvd., Winnipeg, MB.Works generally include: Approximately 540 m3 of Rock removal Supply and installation of approximately 1, 220 m of low-pressure sewer Supply and installation of approximately 1, 600 m of watermain Supply and installation of water and sewer service lines for 66 residential lots Supply of septic tanks and pumps for 66 residential lots Construction of double surface treated gravel roadways including culverts, ditches, and boulevard grading Lot grading and perimeter drainage Regrading of outlet drainage Remediation and relocation of approximately 7, 160 m3 of observed refuse from the abandoned landfill Expansion of a 39, 000 m3 waste disposal cell at the landfill site to accept removed refuse material.A pre-tender meeting will be held at the Goldeye Lake Drive Subdivision site starting at 1:30 p.m. on June 9, 2026. Contractors are to meet at the north end of the subdivision on Lagoon Access Road.Lowest or any bid may not necessarily be accepted.
Solicitation Type : RFT - Request for Tender (Formal) Reference Number : 0000323476 Location : Canada, Manitoba Description : The Fisher River Cree Nation is calling tenders for the Goldeye Lake Drive Subdivision – Phase 1 project.Sealed tenders will be received up to 11:00 a.m. (prevailing Winnipeg time) on June 19, 2026 at the office of JR Cousin Consultants Ltd., 91A Scurfield Blvd., Winnipeg, MB.Works generally include: Approximately 540 m3 of Rock removal Supply and installation of approximately 1, 220 m of low-pressure sewer Supply and installation of approximately 1, 600 m of watermain Supply and installation of water and sewer service lines for 66 residential lots Supply of septic tanks and pumps for 66 residential lots Construction of double surface treated gravel roadways including culverts, ditches, and boulevard grading Lot grading and perimeter drainage Regrading of outlet drainage Remediation and relocation of approximately 7, 160 m3 of observed refuse from the abandoned landfill Expansion of a 39, 000 m3 waste disposal cell at the landfill site to accept removed refuse material.A pre-tender meeting will be held at the Goldeye Lake Drive Subdivision site starting at 1:30 p.m. on June 9, 2026. Contractors are to meet at the north end of the subdivision on Lagoon Access Road.Lowest or any bid may not necessarily be accepted. :
Documents
Tender Notice